WELL · 42-105-32469 · DISTRICT 7

Miller-Hoover B #206

N

Crockett County · Thomason (Strawn) field  · Vertical

Miller-Hoover B #206 (API 42-105-32469) is a well in Crockett County operated by Wagner & Brown, completed January 5, 1980.

The RRC has issued 2 drilling permits between 1979 and 1990, permitted to 10,200 ft.

Completion filings report 3 formation tops, including Canyon, Strawn, Fusselman.

No lease production has been reported under this well’s leases.

Operator of record

Wagner & Brown

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Dec 3, 1992
Permits on file
583
Phone
(432) 682-7936

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWagner & Brown
Production reportsRed Stag Operating, LLCthrough Mar 2026
Latest permitWagner & BrownMar 16, 1990

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,200
total depth, ft
2
permits on file
Mar 16, 1990
last permit issued
Jan 5, 1980
completed
0
cumulative oil, bbl
899K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 5, 1980
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Miller-Hoover B Unit G-9-86090Ozona (Canyon Sand)Red Stag Operating, LLC10899KJan 1993 – Jul 2026
— G-9-86091——000—

Gas, mcf lease total

Last 12 months 183 · prior 12 164(+12%)

0200400600202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wagner & Brown, Ltd.Jan 1993 → Oct 1994
  2. 2Sonat Exploration Company -TylerNov 1994 → Nov 1994
  3. 3Sonat Exploration Co. - MidlandDec 1994 → Mar 1999
  4. 4Rising Star Energy, L.L.C.Apr 1999 → Feb 2000
  5. 5Ricks Exploration, Inc.Mar 2000 → Dec 2003
  6. 6Concho Exploration IncJan 2004 → Mar 2004
  7. 7Chesapeake Operating, Inc.Apr 2004 → Aug 2012
  8. 8Enervest Operating, L.L.C.Sep 2012 → Jan 2019
  9. 9Bedrock Production, LLCFeb 2019 → Aug 2025
  10. 10Bedrock Energy Partners, LLCSep 2025 → Dec 2025
  11. 11Red Stag Operating, LLCJan 2026 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
370871-99OtherWagner & BrownMar 12, 1990Mar 16, 1990—9,964
59524-99DrillWagner & BrownOct 2, 1979Oct 2, 1979Oct 31, 197910,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-9-86090————
—— G-9-86091————

Formation tops

As filed on W-2/G-1. Subsea from 2,435 ft elevation.Download CSV →

FormationMD ftSubsea
CanyonCANYON SAND6,084-3,649
Strawn9,530-7,095
Fusselman9,800-7,365

Perforations

Perforated and open-hole intervals.

FromToType
6,4016,594Perforated
9,5399,668Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,01811500 S
8.6251,07811500 S
2.3759,448——
4.59,9447.8751,030 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 14, 1990Jun 7, 1990—
00Jan 12, 1984Feb 4, 1980—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10532469, documented in the API reference.