TEXAS · WELLS · CROCKETT COUNTY · HOLT "36" LEASE · API 42-105-35341 · DISTRICT 6E

Holt 36 #2

Plugged

Crockett County · Holt Ranch (Ellenburger) field  · Vertical

Holt 36 #2 (API 42-105-35341) is a plugged well in Crockett County, plugged April 28, 1992, last operated by Prime Operating Company.

The RRC has issued one drilling permit, issued March 24, 1987, permitted to 8,500 ft.

It was permitted by Baytech, Inc. and has since transferred to Prime Operating Company on the wellbore schedule.

Completion filings report 2 formation tops, including Canyon, Ellenburger.

Operator of record

Prime Operating Company

Permitted by Baytech, Inc.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Jan 29, 2026
Permits on file
595
Phone
(432) 682-5600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePrime Operating Company
Production reportsnone
Latest permitBaytech, Inc.Mar 24, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
1
permits on file
Mar 24, 1987
last permit issued
Apr 19, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 19, 1987
Shut in
—
Plugged
Apr 28, 1992

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Holt "36" O-9-12103Holt Ranch (Ellenburger)Prime Operating Company200Jan 1993 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
328169-99DrillBaytech, Inc.Mar 24, 1987Mar 24, 1987—8,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 19, 1987Holt 36 O-9-12103Holt Ranch (Ellenburger)Prime Operating CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,557 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon7,528-4,971
Ellenburger7,855-5,298
EllenburgerLOWER ELLENBERGER7,950-5,393

Perforations

Perforated and open-hole intervals.

FromToType
7,8667,876Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,69512.25650 S
5.57,9907.875300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00May 1, 1987Apr 23, 1987Yes
00Apr 30, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10535341, documented in the API reference.