TEXAS · WELLS · CROCKETT COUNTY · API 42-105-35863 · DISTRICT 6E
Henderson Trust #2
Crockett County · Howards Creek (Canyon) field · Producing · Vertical
Henderson Trust #2 (API 42-105-35863) is a well in Crockett County operated by Apache Corporation, completed March 10, 2006 and listed as producing on the RRC schedule.
The RRC has issued 3 drilling permits between 1990 and 2005, permitted to 9,050 ft.
Completion filings report 3 formation tops, including Canyon, Strawn, Devonian.
No lease production has been reported under this well’s leases.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 3, 2025
- Permits on file
- 9,756
- Phone
- (713) 954-5500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Apache Corporationthrough Mar 2026 |
| Latest permit | Apache CorporationAug 15, 2005 |
- 9,050
- total depth, ft
- 3
- permits on file
- Aug 15, 2005
- last permit issued
- Mar 10, 2006
- completed
- 0
- cumulative oil, bbl
- 2.58M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 10, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Henderson Trust G-9-137045 | Howards Creek (Penn.) | Apache Corporation | 1 | 0 | 1.76M | Jan 1993 – Jul 2026 |
| Henderson Trust G-9-218624 | Howards Creek (Canyon) | Apache Corporation | 1 | 0 | 818K | Jan 2006 – Jul 2026 |
Gas, mcf lease total
Last 12 months 7,134 · prior 12 13,892(-49%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exxon Corp.Jan 1993 → Mar 2000
- 2Exxon Mobil CorporationApr 2000 → Oct 2004
- 3Apache CorporationNov 2004 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603139-99 | Recompletion | Apache Corporation | Jul 7, 2005 | Aug 15, 2005 | — | 9,050 |
| 406290-99 | Other | Exxon Corp. | Nov 18, 1992 | Nov 20, 1992 | — | 9,050 |
| 377321-99 | Drill | Exxon Corp. | Aug 30, 1990 | Sep 4, 1990 | Sep 29, 1990 | 9,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 10, 2006 | Henderson Trust G-9-218624 | Howards Creek (Canyon) | Apache Corporation | Producing | 9,050 |
| Nov 20, 1990 | Henderson Trust G-9-137045 | Howards Creek (Penn.) | Apache Corporation | SWR-10-Well · shut in Aug 1, 2005 | 9,050 |
Formation tops
As filed on W-2/G-1. Subsea from 2,480 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,981 | 6,991 | Perforated |
| 7,034 | 7,044 | Perforated |
| 8,702 | 8,883 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,220 | 12.25 | 1,380 S |
| 4.5 | 9,049 | 7.875 | 1,850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 22, 2007 | Jun 23, 2006 | — |
| 00 | Aug 31, 2006 | — | — |
| 00 | Apr 11, 1991 | Jan 10, 1991 | Yes |
| 00 | Mar 4, 1991 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-35863 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-35863 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10535863, documented in the API reference.