WELL · 42-105-38077 · DISTRICT 7
Henderson 25 #10
Crockett County · Ozona NE. (Canyon Sand) field · Temp Abandoned · Vertical
Henderson 25 #10 (API 42-105-38077) is a well in Crockett County operated by Toc Energy Resources LLC, completed November 10, 1998 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued May 5, 1998, permitted to 9,000 ft.
It was permitted by Cross Timbers Operating Company and has since transferred to Toc Energy Resources LLC on the wellbore schedule.
Completion filings report one formation top, including Canyon.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Cross Timbers Operating Company; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 3, 2026
- Permits on file
- 2
- Phone
- (817) 348-0528
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Toc Energy Resources LLC |
| Production reports | Encore Energy Partners Oper LLCthrough Nov 2011 |
| Latest permit | Cross Timbers Operating CompanyMay 5, 1998 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 1
- permits on file
- May 5, 1998
- last permit issued
- Nov 10, 1998
- completed
- 0
- cumulative oil, bbl
- 96.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 10, 1998
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Henderson 25 G-9-170986 | Ozona, NE. (Canyon Sand) | Toc Energy Resources, LLC | 1 | 0 | 96.5K | Nov 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cross Timbers Operating CompanyNov 1998 → May 2000
- 2Encore Operating, L.P.Jun 2000 → Dec 2007
- 3Encore Energy Partners Oper LLCFeb 2008 → Nov 2011
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 473978-99 | Drill | Cross Timbers Operating Company | Mar 3, 1998 | May 5, 1998 | Oct 20, 1998 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-170986 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,511 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 5,962 | -3,451 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,501 | 6,579 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,271 | 11 | 500 S |
| 4.5 | 7,295 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 29, 1998 | Dec 2, 1998 | — |
| 00 | Dec 9, 1998 | — | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-38077 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-38077 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10538077, documented in the API reference.