TEXAS · WELLS · CROCKETT COUNTY · BLACK, HALLIE "9" LEASE · API 42-105-38190 · DISTRICT 01

Black Hallie 9 #3

Y

Crockett County · Simpson-Mann (Canyon) field · Producing  · Vertical

Black Hallie 9 #3 (API 42-105-38190) is a well in Crockett County operated by Hilcorp Energy Company, completed April 17, 1999 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 22, 1998, permitted to 5,815 ft.

It was permitted by Altura Energy Ltd. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 2 formation tops, including Base Cretaceous (marker), Canyon.

Its lease has reported 25 barrels of oil and 197K mcf of gas since April 1999, last reporting volume in April 2026.

Operator of record

Hilcorp Energy Company

Permitted by Altura Energy Ltd.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitAltura Energy Ltd.Sep 22, 1998

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,815
total depth, ft
1
permits on file
Sep 22, 1998
last permit issued
Apr 17, 1999
completed
25
cumulative oil, bbl
197K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 17, 1999
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black, Hallie "9" G-1-173556Simpson-Mann (Canyon)Hilcorp Energy Company125197KApr 1999 – Apr 2026

Gas, mcf lease total

Last 12 months 4,880 · prior 12 3,511(+39%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Altura Energy Ltd.Apr 1999 → Apr 2000
  2. 2Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
479538-99DrillAltura Energy Ltd.Sep 18, 1998Sep 22, 1998Mar 15, 19996,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Apr 17, 1999Black Hallie 9 G-1-173556Simpson-Mann (Canyon)Hilcorp Energy CompanyProducing5,815

Formation tops

As filed on W-2/G-1. Subsea from 2,298 ft elevation.Download CSV →

FormationMD ftSubsea
Base Cretaceous (marker)BASE OF CRETACEOUS9771,321
CanyonTOP OF CANYON4,183-1,885

Perforations

Perforated and open-hole intervals.

FromToType
5,4905,500Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1440——
8.6251,23311500 S
4.55,8007.875825 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 30, 1999Jul 6, 1999Yes
00Jul 29, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10538190, documented in the API reference.