WELL · 42-105-38625 · DISTRICT 7
Mc Donald 18 #7
Crockett County · Vertical
MC Donald 18 #7 (API 42-105-38625) is a permitted well in Crockett County filed by Anadarko E&P Company LP; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2001 and 2003, permitted to 8,500 ft.
Completion filings report 2 formation tops, including Canyon, Pennsylvanian.
Operator of record
Houston, TX · P-5 Y, filed Jul 4, 2025 · 2,635 permits on file · (832) 636-1111
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Scout Energy Management LLCthrough Apr 2026 |
| Latest permit | Anadarko E&P Company LPAug 12, 2003 |
- 8,500
- total depth, ft
- 2
- permits on file
- Aug 12, 2003
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 494K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| McDonald "18" G-9-187968 | Davidson Ranch (Penn. 7890) | Scout Energy Management LLC | 1 | 0 | 494K | Aug 2001 – Jul 2026 |
| McDonald "18" G-9-187969 | Ozona (Canyon Sand) | Scout Energy Management LLC | 1 | 0 | 0 | Aug 2001 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,842 · prior 12 7,297(-6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Rme Petroleum CompanyOct 2001 → Nov 2002
- 2Anadarko E&P Company LPDec 2002 → Dec 2012
- 3Anadarko E&P Onshore LLCJan 2013 → Aug 2016
- 4Epic Permian Operating, LLCSep 2016 → Jan 2025
- 5Scout Energy Management LLCFeb 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 535073-99 | Field transfer | Anadarko E&P Company LP | Aug 7, 2003 | Aug 12, 2003 | — | 8,500 |
| 507438-99 | Drill | Rme Petroleum Company | Apr 5, 2001 | May 2, 2001 | Jul 19, 2001 | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-9-187968 | — | — | — | — |
| — | — G-9-187969 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,484 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Canyon | 6,138 | -3,654 |
| Canyon | 6,183 | -3,699 |
| PennsylvanianPENN | 7,860 | -5,376 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,150 | 6,277 | Perforated |
| 7,856 | 7,951 | Perforated |
| 7,865 | 7,951 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,204 | 11 | 350 S |
| 4.5 | 8,267 | 7.875 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 28, 2002 | Mar 15, 2002 | — |
| 00 | May 24, 2002 | Mar 15, 2002 | Yes |
| 00 | Apr 11, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-105-38625 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-105-38625 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10538625, documented in the API reference.