WELL · 42-107-31908 · DISTRICT 8
PT #51
Crosby County · Hoople (Clear Fork) field · Vertical
PT #51 (API 42-107-31908) is a plugged well in Crosby County, plugged August 18, 2017, last operated by Custer & Wright Operating Inc..
The RRC has issued one drilling permit, issued August 6, 2014, permitted to 5,000 ft.
Completion filings report 4 formation tops, including Yates, San Andres, Glorieta, Clear Fork.
Its lease has reported 101K barrels of oil and 19.2K mcf of gas since April 1999, last reporting in November 2018. The lease carries 22 wells, so these are lease totals, not this well alone.
Operator of record
Custer & Wright Operating Inc.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 5, 2025
- Permits on file
- 249
- Phone
- (432) 687-1565
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Custer & Wright Operating Inc. |
| Production reports | Custer & Wright Operating, Inc.through Jun 2018 |
| Latest permit | Custer & Wright Operating, Inc.Aug 6, 2014 |
- 5,000
- total depth, ft
- 1
- permits on file
- Aug 6, 2014
- last permit issued
- Jan 15, 2016
- completed
- 101K
- cumulative oil, bbl
- 19.2K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 1999 THROUGH Nov 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 15, 2016
- Shut in
- —
- Plugged
- Aug 18, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 22 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| PT O-11-68089 | Hoople (Clear Fork) | Custer & Wright Operating, Inc. | 22 | 101K | 19.2K | Apr 1999 – Nov 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Caprock, Inc.Apr 1999 → Jul 2012
- 2Custer & Wright Operating, Inc.Aug 2012 → Jun 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 791420-99 | Drill | Custer & Wright Operating, Inc. | Jul 10, 2014 | Aug 6, 2014 | Nov 22, 2014 | 5,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-68089 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,807 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 1,590 | 1,217 |
| San AndresSAN ANDRES - HIGH FLOWS, H2S, CO | 2,490 | 317 |
| Glorieta | 3,559 | -752 |
| Clear ForkCLEARFORK | 3,838 | -1,031 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,678 | 3,690 | Perforated |
| 3,852 | 3,864 | Perforated |
| 3,920 | 3,930 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,360 | 12.25 | 665 S |
| 5.5 | 4,105 | 7.875 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 21, 2016 | Feb 25, 2016 | — |
| 00 | Feb 5, 2016 | Jan 19, 2016 | — |
| 00 | Nov 24, 2015 | Nov 16, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-107-31908 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-107-31908 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10731908, documented in the API reference.