TEXAS · WELLS · CULBERSON COUNTY · SWALE 1 UNIT LEASE · API 42-109-32526 · DISTRICT 7B

Swale 1 Unit #1H

Y

Culberson County · Derby (Bone Spring) field · Producing  · Horizontal

Swale 1 Unit #1H (API 42-109-32526) is a horizontal well in Culberson County operated by Coterra Energy Operating CO., completed May 28, 2014 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued February 21, 2013, permitted to 7,387 ft.

It was permitted by Cimarex Energy CO. and has since transferred to Coterra Energy Operating CO. on the wellbore schedule.

Completion filings report 9 formation tops, including Delaware, Cherry Canyon, Bone Spring, Atoka.

No lease production has been reported under this well’s leases.

Operator of record

Coterra Energy Operating Co.

Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active – Extension (X)
P-5 last filed
May 20, 2026
Permits on file
184
Phone
(432) 571-7800

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCoterra Energy Operating Co.
Production reportsCoterra Energy Operating Co.through Nov 2025
Latest permitCimarex Energy Co.Feb 21, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,387
total depth, ft
2
permits on file
Feb 21, 2013
last permit issued
May 28, 2014
completed
0
cumulative oil, bbl
2.71M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 28, 2014
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Swale 1 Unit G-10-273749Derby (Bone Spring)Coterra Energy Operating Co.102.71MMay 2014 – Jul 2026

Gas, mcf lease total

Last 12 months 64,365 · prior 12 127,440(-49%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co.May 2014 → Oct 2025
  2. 2Coterra Energy Operating Co.Nov 2025 → Nov 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
756527-98DrillCimarex Energy Co.Jan 2, 2014Feb 21, 2013Mar 10, 201411,871
756527-99DrillCimarex Energy Co.Feb 8, 2013Feb 21, 2013—11,871

Completions

CompletedLeaseFieldOperatorStatusDepth
May 28, 2014Swale 1 Unit G-10-273749Derby (Bone Spring)Coterra Energy Operating Co.Producing7,387

Formation tops

As filed on W-2/G-1. Subsea from 3,331 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware2,0301,301
Cherry Canyon3,025306
Bone SpringBONE SPRINGS5,568-2,237
Atoka——
DelawareFORD-DELAWARE——
Mississippian——
Morrow——
Rustler——
Strawn——
Wolfcamp——

Perforations

Perforated and open-hole intervals.

FromToType
7,40611,860Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,00412.25950 S
5.511,8928.752,180 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 2, 2014Aug 4, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/10932526, documented in the API reference.