TEXAS · WELLS · CULBERSON COUNTY · RIVA RIDGE 10 A LEASE · API 42-109-32803 · DISTRICT 7B
Riva Ridge 10 A #2H
Culberson County · Ford West (Wolfcamp) field · Producing · Horizontal
Riva Ridge 10 A #2H (API 42-109-32803) is a horizontal well in Culberson County operated by Coterra Energy Operating CO., completed July 20, 2016 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued December 11, 2014, permitted to 9,156 ft.
It was permitted by Cimarex Energy CO. and has since transferred to Coterra Energy Operating CO. on the wellbore schedule.
Completion filings report 9 formation tops, including Delaware, Cherry Canyon, Bone Spring, Wolfcamp.
Its lease has reported 957K barrels of oil and 5.71M mcf of gas since September 2015, last reporting volume in April 2026.
Operator of record
Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 20, 2026
- Permits on file
- 184
- Phone
- (432) 571-7800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Coterra Energy Operating Co. |
| Production reports | Coterra Energy Operating Co.through Apr 2026 |
| Latest permit | Cimarex Energy Co.Dec 11, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,156
- total depth, ft
- 2
- permits on file
- Dec 11, 2014
- last permit issued
- Jul 20, 2016
- completed
- 957K
- cumulative oil, bbl
- 5.71M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2016 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 20, 2016
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Riva Ridge 10 A G-10-280098 | Ford, West (Wolfcamp) | Coterra Energy Operating Co. | 1 | 957K | 5.71M | Sep 2015 – Apr 2026 |
Gas, mcf lease total
Last 12 months 321,576 · prior 12 57,275
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cimarex Energy Co.Jul 2016 → Oct 2025
- 2Coterra Energy Operating Co.Nov 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 801495-98 | Drill | Cimarex Energy Co. | Dec 23, 2015 | Dec 11, 2014 | Aug 17, 2015 | 9,865 |
| 801495-99 | Drill | Cimarex Energy Co. | Dec 9, 2014 | Dec 11, 2014 | Aug 17, 2015 | 9,865 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 20, 2016 | Riva Ridge 10 A G-10-280098 | Ford West (Wolfcamp) | Coterra Energy Operating Co. | Producing | 9,156 |
Formation tops
As filed on W-2/G-1. Subsea from 3,479 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delaware | 2,312 | 1,167 |
| Cherry Canyon | 3,310 | 169 |
| Bone SpringBONE SPRINGS | 5,869 | -2,390 |
| Wolfcamp | 8,897 | -5,418 |
| Atoka | — | — |
| Bone SpringBONE SPRINGS | — | — |
| Cherry Canyon | — | — |
| Delaware | — | — |
| DelawareFORD-DELAWARE | — | — |
| Mississippian | — | — |
| Morrow | — | — |
| Rustler | — | — |
| Strawn | — | — |
| Wolfcamp | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,119 | 19,450 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,295 | 12.25 | 1,065 S |
| 7 | 9,366 | 8.75 | 950 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 3, 2016 | Sep 29, 2016 | Yes |
| 00 | Jun 13, 2016 | Mar 14, 2016 | Yes |
Well logs
2 logs loaded from the RRC's log index, the latest received Sep 20, 2018. Gamma ray, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| Gamma RaySpans Delaware, Cherry Canyon, Bone Spring | TIFF | 200 to 8,736 | Sep 20, 2018 | 3.08 |
| RESISTIVITYSpans Bone Spring, Wolfcamp | TIFF | 8,725 to 9,366 | Jul 31, 2017run Aug 24, 2015 | 3.07 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-109-32803 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-109-32803 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10932803, documented in the API reference.