TEXAS · WELLS · CULBERSON COUNTY · API 42-109-34465 · DISTRICT 7B
Tomy Lee 20-29 B #2H
Culberson County · Ford West (Wolfcamp) field · Producing · Horizontal
Tomy Lee 20-29 B #2H (API 42-109-34465) is a horizontal well in Culberson County operated by Coterra Energy Operating CO., completed February 21, 2026 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued May 8, 2025, permitted to 9,097 ft.
It was permitted by Cimarex Energy CO. and has since transferred to Coterra Energy Operating CO. on the wellbore schedule.
Completion filings report 9 formation tops, including Delaware, Cherry Canyon, Bone Spring, Wolfcamp.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 20, 2026
- Permits on file
- 184
- Phone
- (432) 571-7800
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Coterra Energy Operating Co. |
| Production reports | none |
| Latest permit | Cimarex Energy Co.May 8, 2025 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,097
- total depth, ft
- 1
- permits on file
- May 8, 2025
- last permit issued
- Feb 21, 2026
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 21, 2026
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 907774-99 | Drill | Cimarex Energy Co. | May 5, 2025 | May 8, 2025 | Jun 3, 2025 | 9,992 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 21, 2026 | Tomy Lee 20-29 B G-10-301744 | Ford West (Wolfcamp) | Coterra Energy Operating Co. | Producing | 9,097 |
Formation tops
As filed on W-2/G-1. Subsea from 3,298 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| DelawareFORD / DELAWARE | 2,142 | 1,156 |
| Delaware | 2,245 | 1,053 |
| Cherry Canyon | 2,976 | 322 |
| Bone Spring | 5,763 | -2,465 |
| Wolfcamp | 8,764 | -5,466 |
| Atoka | — | — |
| CapitanCAPITAN REEF | — | — |
| Morrow | — | — |
| Rustler | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,498 | 19,771 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,023 | 14.75 | 1,860 S |
| 7 | 9,483 | 9.625 | 2,410 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 15, 2026 | May 18, 2026 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-109-34465 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-109-34465 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/10934465, documented in the API reference.