TEXAS · WELLS · ECTOR COUNTY · API 42-135-02701 · DISTRICT 7B
Goldsmith Andector Unit #R151W
Ector County · Goldsmith (Clear Fork) field · Shut In · Vertical
Goldsmith Andector Unit #R151W (API 42-135-02701) is a well in Ector County operated by Maverick Permian LLC, completed November 11, 1993 and listed as shut in on the RRC schedule, shut in October 1, 2016.
The RRC has issued one drilling permit, issued October 12, 1993, permitted to 8,537 ft.
It was permitted by Phillips Petroleum Company and has since transferred to Maverick Permian LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Holt, Glorieta, Up Clearfork, Tubb.
Its 2 leases have reported 18.5M barrels of oil and 165M mcf of gas since January 1993, last reporting volume in April 2026. The leases carry 670 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Permitted by Phillips Petroleum Company; the EWA schedule now lists a different operator.
- Based in
- Keithville, LA
- P-5 status
- Active (A)
- P-5 last filed
- Jan 28, 2026
- Permits on file
- 12
- Phone
- (318) 751-3917
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Maverick Permian LLC |
| Production reports | Maverick Permian LLCthrough Apr 2026 |
| Latest permit | Phillips Petroleum CompanyOct 12, 1993 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,537
- total depth, ft
- 1
- permits on file
- Oct 12, 1993
- last permit issued
- Nov 11, 1993
- completed
- 18.5M
- cumulative oil, bbl
- 165M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 11, 1993
- Shut in
- Oct 1, 2016
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 670 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith Andector Unit O-10-21193 | Goldsmith (Clear Fork) | Maverick Permian LLC | 625 | 14.3M | 162M | Jan 1993 – Apr 2026 |
| South Fault Block Unit O-10-27818 | Andector (Ellenburger) | Maverick Permian LLC | 45 | 4.13M | 3.32M | Jan 1993 – Apr 2026 |
Gas, mcf lease total
Last 12 months 1,279,896 · prior 12 2,078,297(-38%)
Oil, barrels lease total
Last 12 months 186,908 · prior 12 210,109(-11%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Phillips Petroleum CompanyJan 1993 → Dec 2002
- 2Conocophillips CompanyJan 2003 → Mar 2022
- 3Maverick Permian LLCApr 2022 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 416895-99 | Recompletion | Phillips Petroleum Company | Oct 8, 1993 | Oct 12, 1993 | Oct 25, 1993 | 6,430 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 11, 1993 | Goldsmith Andector Unit O-10-21193 | Goldsmith (Clear Fork) | Maverick Permian LLC | Shut In · shut in Oct 1, 2016 | 8,537 |
| Nov 30, 1981 | South Fault Block Unit O-10-27818 | Andector (Ellenburger) | Maverick Permian LLC | Not on Schedule | — |
| — | Embar O-10-238 | Andector (Waddell) | Phillips Petroleum Company | Not on Schedule | — |
| — | Embar O-10-219 | Andector (Ellenburger) | Phillips Petroleum Company | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,201 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,065 | 6,300 | Perforated |
| 7,784 | 8,490 | Perforated |
| — | 8,490 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 286 | 17.5 | 300 S |
| 13.375 | 287 | 17.5 | 350 S |
| 8.625 | 3,781 | 11 | 3,700 S |
| 8.625 | 3,888 | 11 | 4,100 S |
| 2.375 | 8,146 | — | — |
| 2.375 | 8,435 | — | — |
| 5.5 | 8,517 | 7.875 | 1,075 S |
| 5.5 | 8,536 | 7.875 | 1,075 S |
| 5.5 | 8,537 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 2011 | Jan 17, 2011 | — |
| 00 | Aug 18, 1994 | Jun 8, 1994 | — |
| 00 | Jul 15, 1994 | Aug 12, 1959 | — |
| 00 | Jan 12, 1984 | Aug 12, 1959 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-02701 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-02701 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 2.46M
- bbl, all reported
- Feb 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000043092 | H-1 Injection | Canceled Jul 7, 1994 | 0 | 0 | 8,480–8,490 |
| 000079478 | H-1 Injection | Active | 1,800 | 2,000 | 5,262–6,320 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13502701, documented in the API reference.