WELL · 42-135-34308 · DISTRICT 8

Goldsmith C. A. Etal #1405

Plugged

Ector County · Goldsmith (5600) field  · Vertical

Goldsmith C. A. Etal #1405 (API 42-135-34308) is a plugged well in Ector County, plugged May 9, 2024, last operated by Xto Energy Inc..

The RRC has issued 2 drilling permits between 1983 and 1985, permitted to 6,600 ft.

It was permitted by Gulf Oil Corp. and has since transferred to Xto Energy Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Rustler, 5600, Tubb.

Its 2 leases have reported 26.8M barrels of oil and 53M mcf of gas since January 1993, last reporting in July 2026. The leases carry 1,583 wells, so these are lease totals, not this well alone.

Operator of record

XTO Energy Inc.

Permitted by Gulf Oil Corp.; the EWA schedule now lists a different operator.

Based in
Spring, TX
P-5 status
Active – Extension (X)
P-5 last filed
Apr 8, 2026
Permits on file
16,156
Phone
(346) 502-1572

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitGulf Oil Corp.Mar 18, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,600
total depth, ft
2
permits on file
Mar 18, 1985
last permit issued
Apr 16, 1985
completed
26.8M
cumulative oil, bbl
53M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 16, 1985
Shut in
—
Plugged
May 9, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 1,583 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Goldsmith, C. A., Etal O-10-2100Goldsmith (Clear Fork)Hilcorp Energy Company88418.5M43.1MJan 1993 – Jul 2026
Goldsmith, C. A., Etal O-10-2290Goldsmith (5600)XTO Energy Inc.6998.37M9.94MJan 1993 – Jan 2007

Oil, barrels lease total

Last 12 months 245,825 · prior 12 213,540(+15%)

010K20K30K202420252026

Gas, mcf lease total

Last 12 months 399,792 · prior 12 252,239(+58%)

050K100K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
  2. 2XTO Energy Inc.Aug 2004 → Mar 2025
  3. 3Hilcorp Energy CompanyApr 2025 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
269816-99RecompletionGulf Oil Corp.Mar 15, 1985Mar 18, 1985—6,600
210038-99DrillGulf Oil Corp.Sep 6, 1983Sep 7, 1983—6,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-2100————
—— O-10-2290————

Formation tops

As filed on W-2/G-1. Subsea from 3,189 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,4851,704
56005,215-2,026
Tubb6,167-2,978

Perforations

Perforated and open-hole intervals.

FromToType
5,3565,755Perforated
6,1876,282Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,48512.25600 S
8.6251,48512.25600 S
5.56,5947.875675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 31, 2007May 10, 1985—
00Jul 5, 1985May 10, 1985—
00Jul 2, 1985——
00Feb 2, 1984Jan 12, 1984—
00Jan 25, 1984Jan 12, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/13534308, documented in the API reference.