WELL · 42-135-34833 · DISTRICT 8
Goldsmith C. A. Etal #1508
Ector County · Lawson (San Andres) field · Vertical
Goldsmith C. A. Etal #1508 (API 42-135-34833) is a plugged well in Ector County, plugged January 18, 2017, last operated by Hilcorp Energy Company.
The RRC has issued 2 drilling permits between 1985 and 2013, permitted to 6,350 ft.
It was permitted by Xto Energy Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.
Completion filings report 4 formation tops, including San Andres, Holt, 5600, Glorieta.
Its 3 leases have reported 27.5M barrels of oil and 54M mcf of gas since January 1993, last reporting in July 2026. The leases carry 1,631 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by XTO Energy Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Mar 27, 2026
- Permits on file
- 3,454
- Phone
- (713) 209-2400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Hilcorp Energy Company |
| Production reports | Hilcorp Energy Companythrough Apr 2026 |
| Latest permit | XTO Energy Inc.Aug 13, 2013 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,350
- total depth, ft
- 2
- permits on file
- Aug 13, 2013
- last permit issued
- Feb 20, 2015
- completed
- 27.5M
- cumulative oil, bbl
- 54M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Feb 20, 2015
- Shut in
- —
- Plugged
- Jan 18, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 1,631 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Goldsmith, C. A., Etal O-10-2100 | Goldsmith (Clear Fork) | Hilcorp Energy Company | 884 | 18.5M | 43.1M | Jan 1993 – Jul 2026 |
| Goldsmith, C. A. Etal O-10-3441 | Lawson (San Andres) | Hilcorp Energy Company | 48 | 606K | 1.05M | Jan 1993 – Jul 2026 |
| Goldsmith, C. A., Etal O-10-2290 | Goldsmith (5600) | XTO Energy Inc. | 699 | 8.37M | 9.94M | Jan 1993 – Jan 2007 |
Oil, barrels lease total
Last 12 months 282,714 · prior 12 252,934(+12%)
Gas, mcf lease total
Last 12 months 509,233 · prior 12 359,240(+42%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jul 2004
- 2XTO Energy Inc.Aug 2004 → Mar 2025
- 3Hilcorp Energy CompanyApr 2025 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 767775-99 | Recompletion | XTO Energy Inc. | Aug 7, 2013 | Aug 13, 2013 | May 29, 2013 | 6,300 |
| 267662-99 | Drill | Gulf Oil Corp. | Feb 20, 1985 | Feb 21, 1985 | — | 6,350 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-2100 | — | — | — | — |
| — | — O-10-2290 | — | — | — | — |
| — | — O-10-3441 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,135 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 4,138 | -1,003 |
| Holt | 4,972 | -1,837 |
| 5600 | 5,248 | -2,113 |
| Glorieta | 5,366 | -2,231 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,294 | 4,366 | Perforated |
| 5,458 | 6,022 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,515 | 12.25 | 700 S |
| 5.5 | 6,299 | 7.875 | 600 S |
| 5.5 | 6,302 | 7.875 | 1,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 23, 2015 | Feb 24, 2015 | — |
| 00 | Mar 28, 2014 | Aug 14, 2013 | — |
| 00 | Jan 31, 2007 | Aug 2, 1985 | — |
| 00 | Sep 11, 1985 | Aug 2, 1985 | — |
| 00 | Aug 24, 1985 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-135-34833 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-135-34833 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13534833, documented in the API reference.