WELL · 42-137-31634 · DISTRICT 1
Canyon Ranch #1124E
Edwards County · Jack Rabbit (Holman) field · Vertical
Canyon Ranch #1124E (API 42-137-31634) is a plugged well in Edwards County, plugged June 2, 2015, last operated by Enervest Operating L.L.C..
The RRC has issued one drilling permit (amended once), issued July 16, 2002, permitted to 7,200 ft.
It was permitted by Dominion Oklahoma Texas E&P, Inc and has since transferred to Enervest Operating L.L.C. on the wellbore schedule.
Completion filings report 2 formation tops, including Canyon, Holman.
Operator of record
Permitted by Dominion Oklahoma Texas E&P, Inc; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jan 13, 2026
- Permits on file
- 1,249
- Phone
- (713) 659-3500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enervest Operating L.L.C. |
| Production reports | Highmount Expl & Prod Texas LLCthrough Aug 2010 |
| Latest permit | Dominion Oklahoma Texas E&P, IncJul 16, 2002 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,200
- total depth, ft
- 2
- permits on file
- Jul 16, 2002
- last permit issued
- Oct 13, 2002
- completed
- 0
- cumulative oil, bbl
- 30.3K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Jun 2015
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 13, 2002
- Shut in
- —
- Plugged
- Jun 2, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Canyon Ranch G-1-193527 | Jack Rabbit (Holman) | Enervest Operating, L.L.C. | 1 | 0 | 30.3K | Oct 2002 – Jun 2015 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Dominion Oklahoma Texas E&P, IncOct 2002 → Sep 2007
- 2Highmount Expl & Prod Texas LLCOct 2007 → Aug 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 521901-98 | Drill | Dominion Oklahoma Texas E&P, Inc | Sep 9, 2002 | Jul 16, 2002 | Aug 12, 2002 | 7,200 |
| 521901-99 | Drill | Dominion Oklahoma Texas E&P, Inc | Jul 16, 2002 | Jul 16, 2002 | — | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-193527 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,299 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonUPPER CANYON | 3,430 | -1,131 |
| Holman | 6,144 | -3,845 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,170 | 6,218 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,208 | 11 | 305 S |
| 4.5 | 6,842 | 7.875 | 850 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 16, 2003 | Jan 9, 2003 | Yes |
| 00 | Apr 1, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-137-31634 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-137-31634 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/13731634, documented in the API reference.