WELL · 42-151-33263 · DISTRICT 8
Adams Unit #1H
Fisher County · Garden City S. (Wolfcamp) field · Producing · Horizontal
Adams Unit #1H (API 42-151-33263) is a horizontal well in Fisher County operated by Walsh & Watts Inc., completed September 23, 2022 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued June 7, 2022, permitted to 7,000 ft.
It was permitted by Moriah Operating,LLC and has since transferred to Walsh & Watts Inc. on the wellbore schedule.
Completion filings report 10 formation tops, including Coleman Junction, Noodle Creek - Disposal, Saddle Creek, Breckenridge - Disposal.
Its lease has reported 126K barrels of oil and 95.9K mcf of gas since September 2022, last reporting in July 2026.
Operator of record
Permitted by Moriah Operating,llc; the EWA schedule now lists a different operator.
Aledo, TX · P-5 Y, filed Sep 4, 2025 · 361 permits on file · (855) 229-2122
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Walsh & Watts Inc. |
| Production reports | Walsh & Watts, Inc.through Apr 2026 |
| Latest permit | Moriah Operating,llcJun 7, 2022 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,000
- total depth, ft
- 1
- permits on file
- Jun 7, 2022
- last permit issued
- Sep 23, 2022
- completed
- 126K
- cumulative oil, bbl
- 95.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2022 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 23, 2022
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
32.786099, -100.654379
OpenStreetMap → · Google Maps →
Permit surface location from the RRC GIS record, in Fisher County.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Adams Unit O-10-58235 | Garden City, S. (Wolfcamp) | Walsh & Watts, Inc. | 1 | 126K | 95.9K | Sep 2022 – Jul 2026 |
Oil, barrels lease total
Last 12 months 13,883 · prior 12 17,435(-20%)
Gas, mcf lease total
Last 12 months 12,347 · prior 12 11,407(+8%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Moriah Operating,llcOct 2022 → Jan 2026
- 2Walsh & Watts, Inc.Feb 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 880735-99 | Drill | Moriah Operating,llc | Jun 1, 2022 | Jun 7, 2022 | Jun 21, 2022 | 7,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-58235 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,134 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Coleman JunctionCOLEMAN JUNCTION - CORROSIVE; PO | 3,520 | -1,386 |
| Noodle Creek - Disposal | 4,224 | -2,090 |
| Saddle CreekSADDLE CREEK - DISPOSAL | 4,439 | -2,305 |
| Breckenridge - Disposal | — | — |
| CiscoCISCO (REEF, LIME, SAND) - DISPO | — | — |
| Crystal Falls - Disposal | — | — |
| Dothan Sand - Disposal | — | — |
| Flippen - Disposal | — | — |
| Hope - Disposal | — | — |
| San AndresSAN ANDRES - DISPOSAL | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,773 | 15,860 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 1,240 | 12.25 | 700 S |
| 7 | 6,730 | 8.75 | 700 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 25, 2023 | Nov 28, 2022 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-151-33263 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-151-33263 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Nearby wells and their tops
NEAREST 8 LOCATED WELLS WITH TOPS · WITHIN 16 KM
Draw a cross-section
This well's tops beside its 5 nearest neighbours, subsea-aligned so they line up regardless of surface terrain.
EA686942-151-33265
0.0 KM · Moriah Operating,llc · Section with this well →
| Coleman Junction | 3,520 | -1,389 |
| Noodle Creek - Disposal | 4,224 | -2,093 |
| Saddle Creek | 4,439 | -2,308 |
| Swastika - Disposal | 4,730 | -2,599 |
| Canyon | 6,470 | -4,339 |
| Flippen - Disposal | — | |
| San Andres | — | |
| Cisco | — |
10 TOPS · FIRST 8
EA6869B42-151-33304
0.5 KM · Moriah Operating,llc · Section with this well →
| Wichita-Albany | 2,695 | -561 |
| Coleman Junction | 3,559 | -1,425 |
| Noodle Creek - Disposal | 4,238 | -2,104 |
| Saddle Creek | 4,490 | -2,356 |
| Cherry Canyon | 6,224 | -4,090 |
| Cisco | 6,224 | -4,090 |
| Flippen - Disposal | — | |
| San Andres | — |
10 TOPS · FIRST 8
EA6869C42-415-35690
0.6 KM · Moriah Operating,llc · Section with this well →
| Wichita-Albany | 2,732 | -598 |
| Coleman Junction | 3,559 | -1,425 |
| San Andres | — | |
| Yates | — | |
| Wolfcamp | — | |
| Wichita-Albany | — | |
| Spraberry | — | |
| Glorieta | — |
10 TOPS · FIRST 8
Emily42-151-33134
1.8 KM · Moriah Operating,llc · Section with this well →
| San Andres | 1,145 | 966 |
| Coleman Junction | 3,458 | -1,347 |
| Noodle Creek - Disposal | 4,162 | -2,051 |
| Saddle Creek | 4,413 | -2,302 |
| Crystal Falls - Disposal | — | |
| Cisco | — | |
| Breckenridge - Disposal | — | |
| Hope - Disposal | — |
10 TOPS · FIRST 8
Emily42-151-33133
1.8 KM · Moriah Operating,llc · Section with this well →
| San Andres | 1,146 | 964 |
| Coleman Junction | 3,457 | -1,347 |
| Noodle Creek - Disposal | 4,160 | -2,050 |
| Saddle Creek | 4,412 | -2,302 |
| Dothan Sand - Disposal | — | |
| Crystal Falls - Disposal | — | |
| Cisco | — | |
| Caddo | — |
10 TOPS · FIRST 8
Emily SWD42-151-33124
1.8 KM · Moriah Operating,llc · Section with this well →
| San Andres | 1,145 | 965 |
| Cisco | 2,690 | -580 |
| Dothan Sand - Disposal | 2,840 | -730 |
| Hope - Disposal | 3,150 | -1,040 |
| Flippen - Disposal | 3,170 | -1,060 |
| Breckenridge - Disposal | 3,300 | -1,190 |
| Crystal Falls - Disposal | 3,410 | -1,300 |
| Coleman Junction | 3,458 | -1,348 |
11 TOPS · FIRST 8
Sahara 942-151-33140
2.1 KM · Browning Oil Company, Inc. · Section with this well →
| Coleman Junction | 3,545 | -1,403 |
| Noodle Creek - Disposal | 4,146 | -2,004 |
| Saddle Creek | 4,529 | -2,387 |
| Flippen - Disposal | 5,515 | -3,373 |
| Crystal Falls - Disposal | 5,890 | -3,748 |
| Dothan Sand - Disposal | — | |
| San Andres | — | |
| Hope - Disposal | — |
10 TOPS · FIRST 8
Ashley42-151-33168
2.3 KM · Moriah Operating,llc · Section with this well →
| San Andres | 1,185 | 927 |
| Coleman Junction | 3,432 | -1,320 |
| Noodle Creek - Disposal | 4,138 | -2,026 |
| Saddle Creek | 4,380 | -2,268 |
| Crystal Falls - Disposal | — | |
| Dothan Sand - Disposal | — | |
| Flippen - Disposal | — | |
| Hope - Disposal | — |
10 TOPS · FIRST 8
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15133263, documented in the API reference.