WELL · 42-155-30505 · DISTRICT 9
Campbell #1
Foard County · Rocky Wall (Congl.) field · Vertical
Campbell #1 (API 42-155-30505) is a plugged well in Foard County, plugged February 5, 2009, last operated by Dry Fork Production CO. LLC.
The RRC has issued one drilling permit, issued September 28, 1989, permitted to 6,200 ft.
It was permitted by Srg Oil Corporation and has since transferred to Dry Fork Production CO. LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Canyon, Caddo, Conglomerate.
Its lease has reported 15K barrels of oil and 30 mcf of gas since January 1993, last reporting in July 2009.
Operator of record
Permitted by SRG Oil Corporation; the EWA schedule now lists a different operator.
- Based in
- Wichita Falls, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- May 1, 2026
- Permits on file
- 207
- Phone
- (940) 723-7052
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Dry Fork Production Co. LLC |
| Production reports | Dry Fork Production Co., LLCthrough Oct 2008 |
| Latest permit | SRG Oil CorporationSep 28, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,200
- total depth, ft
- 1
- permits on file
- Sep 28, 1989
- last permit issued
- Dec 11, 1989
- completed
- 15K
- cumulative oil, bbl
- 30
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2009
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 11, 1989
- Shut in
- —
- Plugged
- Feb 5, 2009
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Campbell O-13-27586 | Rocky Wall (Congl.) | Dry Fork Production Co., LLC | 1 | 15K | 30 | Jan 1993 – Jul 2009 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1H-M Resource Management, Inc.Jan 1993 → Mar 2003
- 2Dry Fork Production CoApr 2003 → Apr 2003
- 3Dry Fork Production Co., LLCMay 2003 → Oct 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 364344-99 | Drill | SRG Oil Corporation | Sep 25, 1989 | Sep 28, 1989 | — | 6,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Dec 11, 1989 | Campbell O-13-27586 | Rocky Wall (Congl.) | Dry Fork Production Co. LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 1,461 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,706 | 5,740 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 262 | 12.25 | 130 S |
| 4.5 | 5,850 | 7.875 | 200 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 24, 1990 | Jan 4, 1990 | Yes |
| 00 | Jan 11, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-155-30505 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-155-30505 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/15530505, documented in the API reference.