WELL · 42-155-30652 · DISTRICT 9

Swan #2

N

Foard County · Thalia (Cisco) field  · Vertical

Swan #2 (API 42-155-30652) is a well in Foard County operated by Palmer Petroleum Inc., completed September 29, 2003.

The RRC has issued 2 drilling permits (amended once) between 2003 and 2004, permitted to 3,000 ft.

Completion filings report 7 formation tops, including Wichita-Albany, U. Tannehill Sand, Tannehill, Saddle Creek.

Its 2 leases have reported 483 barrels of oil and 72.9K mcf of gas since September 2003, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Palmer Petroleum Inc.

Based in
Shreveport, LA
P-5 status
Inactive (I)
P-5 last filed
Sep 16, 2024
Permits on file
304
Phone
(318) 222-0517

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePalmer Petroleum Inc.
Production reportsBlackbrush O & G, LLCthrough Apr 2026
Latest permitPalmer Petroleum Inc.Mar 10, 2004

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

3,000
total depth, ft
3
permits on file
Mar 10, 2004
last permit issued
Sep 29, 2003
completed
483
cumulative oil, bbl
72.9K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 29, 2003
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Swan G-13-201296Thalia (Tannehill)Blackbrush O & G, LLC1072.8KFeb 2004 – Jul 2026
Swan O-13-30228Thalia (Cisco)Palmer Petroleum Inc.1483146Sep 2003 – Oct 2005

Gas, mcf lease total

Last 12 months 234 · prior 12 330(-29%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Palmer Petroleum Inc.Sep 2003 → Nov 2006
  2. 2MB Exploration, LLCDec 2006 → Jul 2008
  3. 3Blackbrush O & G, Inc.Aug 2008 → Apr 2012
  4. 4Blackbrush O & G, LLCMay 2012 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
542977-99RecompletionPalmer Petroleum Inc.Mar 9, 2004Mar 10, 2004Feb 17, 20042,350
534756-98DrillPalmer Petroleum Inc.Sep 5, 2003Jul 31, 2003Sep 2, 20033,000
534756-99DrillPalmer Petroleum Inc.Jul 30, 2003Jul 31, 2003—2,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-13-201296————
—— O-13-30228————

Formation tops

As filed on W-2/G-1. Subsea from 1,380 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA FALLS804576
Wichita-AlbanyWICHITA FALLS854526
U. Tannehill Sand1,398-18
Tannehill1,435-55
Saddle CreekSADDLE CREEK LIME1,565-185
Breckenridge Lime1,811-431
Breckenridge Lime1,887-507
CanyonCANYON LIME1,906-526
CanyonCANYON REEF1,958-578
Basement2,270-890

Perforations

Perforated and open-hole intervals.

FromToType
1,5891,596Perforated
1,7681,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513812.25100 S
4.52,3287.875630 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 2004Mar 24, 2004Yes
00Jun 2, 2004——
00Dec 19, 2003Oct 14, 2003Yes
00Dec 1, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15530652, documented in the API reference.