WELL · 42-155-30655 · DISTRICT 9

Morris #7

Shut in

Foard County · Thalia N. (Canyon) field · Shut IN  · Vertical

Morris #7 (API 42-155-30655) is a well in Foard County operated by Blackbrush O & G LLC, completed October 23, 2003 and listed as shut in on the RRC schedule, shut in June 1, 2020.

The RRC has issued one drilling permit, issued September 3, 2003, permitted to 2,200 ft.

It was permitted by Palmer Petroleum Inc. and has since transferred to Blackbrush O & G LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Wichita-Albany, U Tannehill Sand, Saddle Creek, Breckenridge Lime.

Its lease has reported 4K barrels of oil and 28 mcf of gas since October 2003, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.

Operator of record

Blackbrush O & G LLC

Permitted by Palmer Petroleum Inc.; the EWA schedule now lists a different operator.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Sep 16, 2025
Permits on file
339
Phone
(210) 495-5577

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlackbrush O & G LLC
Production reportsBlackbrush O & G, LLCthrough Dec 2019
Latest permitPalmer Petroleum Inc.Sep 3, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,200
total depth, ft
1
permits on file
Sep 3, 2003
last permit issued
Oct 23, 2003
completed
4K
cumulative oil, bbl
28
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2003 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 23, 2003
Shut in
Jun 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morris O-13-30301Thalia, N. (Canyon)Blackbrush O & G, LLC34K28Oct 2003 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Palmer Petroleum Inc.Oct 2003 → Nov 2006
  2. 2MB Exploration, LLCDec 2006 → Jul 2008
  3. 3Blackbrush O & G, Inc.Aug 2008 → Apr 2012
  4. 4Blackbrush O & G, LLCMay 2012 → Dec 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
535124-99DrillPalmer Petroleum Inc.Aug 8, 2003Sep 3, 2003Sep 15, 20032,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 23, 2003Morris O-13-30301Thalia N. (Canyon)Blackbrush O & G LLCShut IN · shut in Jun 1, 20202,200

Formation tops

As filed on W-2/G-1. Subsea from 1,353 ft elevation.Download CSV →

FormationMD ftSubsea
Wichita-AlbanyWICHITA FALLS860493
U Tannehill Sand1,456-103
Saddle CreekSADDLE CREEK LIME1,589-236
Breckenridge Lime1,868-515
CanyonCANYON LIME2,010-657

Perforations

Perforated and open-hole intervals.

FromToType
2,0102,018Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62513612.25100 S
4.52,1647.875535 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 2004Mar 4, 2004Yes
00May 7, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/15530655, documented in the API reference.