WELL · 42-165-34002 · DISTRICT 8

Thames C. T. #1

N

Gaines County · Emerald (Silurian) field  · Vertical

Thames C. T. #1 (API 42-165-34002) is a well in Gaines County operated by Apache Corporation, completed October 29, 2008.

The RRC has issued 2 drilling permits (amended once) between 1988 and 2010, permitted to 14,100 ft.

Completion filings report 6 formation tops, including Rustler, San Andres, Wolfcamp, Mississippian.

Its 2 leases have reported 488K barrels of oil and 56.2K mcf of gas since January 1993, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Apache Corporation

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitApache CorporationMar 31, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,100
total depth, ft
3
permits on file
Mar 31, 2010
last permit issued
Oct 29, 2008
completed
488K
cumulative oil, bbl
56.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 29, 2008
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Thames, C. T. O-11-69501Wasson (Wolfcamp)Hilcorp Energy Company1210K54.2KFeb 2010 – Jul 2026
Thames, C. T. O-11-66314Emerald (Silurian)Apache Corporation1278K1.97KJan 1993 – Apr 2010

Oil, barrels lease total

Last 12 months 5,122 · prior 12 4,748(+8%)

05001K202420252026

Gas, mcf lease total

Last 12 months 1,904 · prior 12 1,437(+32%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Feb 1998
  2. 2Apache CorporationMar 1998 → Nov 2024
  3. 3Hilcorp Energy CompanyDec 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
693452-99RecompletionApache CorporationMar 25, 2010Mar 31, 2010Jan 14, 201013,800
351111-98DrillExxon Corp.Oct 11, 1988Sep 13, 1988—14,100
351111-99DrillExxon Corp.Sep 12, 1988Sep 13, 1988—12,700

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66314————
—— O-11-69501————

Formation tops

As filed on W-2/G-1. Subsea from 3,507 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,3251,182
San Andres5,312-1,805
Wolfcamp9,357-5,850
MississippianMISSISSIPPIAN LIME11,644-8,137
MississippianMISSISSIPPI LIME11,644-8,137
Precambrian12,284-8,777
Silurian (undifferentiated)SILURIAN12,284-8,777
Precambrian13,743-10,236

Perforations

Perforated and open-hole intervals.

FromToType
10,62610,677Perforated
12,28612,300Perforated
12,28712,357Perforated
12,28712,387Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37533217.5362 S
9.6254,90912.251,700 S
5.512,6018.752,100 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 2010Feb 24, 2010Yes
00Apr 8, 2010——
00Mar 19, 2009Dec 16, 2008—
00Jul 7, 1992Jun 5, 1992—
00Mar 21, 1989Mar 10, 1989Yes
00Mar 17, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Nov 2009
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000083264H-1 InjectionNot activated2,0002,70012,287–12,357

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120082009

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16534002, documented in the API reference.