TEXAS · WELLS · GARZA COUNTY · TYLER, MARK LEASE · API 42-169-32230 · DISTRICT 7B
Tyler Mark #1
Garza County · Post (Glorieta) field · Vertical
Tyler Mark #1 (API 42-169-32230) is a plugged well in Garza County, plugged January 30, 2014, last operated by Rjd Management CO. Inc..
The RRC has issued one drilling permit, issued December 9, 1983, permitted to 3,200 ft.
It was permitted by Jimlynn Services, Inc. and has since transferred to Rjd Management CO. Inc. on the wellbore schedule.
Completion filings report 2 formation tops, including San Andres, Glorieta.
Operator of record
Permitted by Jimlynn Services, Inc.; the EWA schedule now lists a different operator.
- Based in
- Lubbock, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 8, 2025
- Permits on file
- 76
- Phone
- (806) 762-4186
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | RJD Management Co. Inc. |
| Production reports | none |
| Latest permit | Jimlynn Services, Inc.Dec 9, 1983 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,200
- total depth, ft
- 1
- permits on file
- Dec 9, 1983
- last permit issued
- Jul 13, 1984
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 13, 1984
- Shut in
- —
- Plugged
- Jan 30, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Tyler, Mark O-11-64973 | Post (Glorieta) | RJD Management Co., Inc. | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 223002-99 | Drill | Jimlynn Services, Inc. | Dec 5, 1983 | Dec 9, 1983 | Jan 31, 1984 | 3,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 13, 1984 | Tyler Mark O-11-64973 | Post (Glorieta) | RJD Management Co. Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,373 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San Andres | 1,649 | 724 |
| Glorieta | 2,540 | -167 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,019 | 3,126 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 257 | 11 | 150 sx |
| 4.5 | 3,202 | 7.875 | 740 sx |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 22, 1984 | Jul 30, 1984 | — |
| 00 | Aug 21, 1984 | Jul 30, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-169-32230 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-169-32230 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 19.2K
- bbl, last 12 reported months
- 803K
- bbl, all reported
- May 2014
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000053415 | W-14 Disposal | Plugged May 5, 2014 | 500 | 1,350 | 2,740–3,200 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 19,238 · prior 12 40,632(-53%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.