WELL · 42-169-33274 · DISTRICT 8

King B #6

Shut in

Garza County · Buenos (Consolidated) field · Shut IN  · Vertical

King B #6 (API 42-169-33274) is a well in Garza County operated by Walsh & Watts Inc., completed December 6, 1994 and listed as shut in on the RRC schedule, shut in August 1, 2009.

The RRC has issued one drilling permit, issued September 30, 1994, permitted to 8,800 ft.

It was permitted by Huber, J. M., Corporation and has since transferred to Walsh & Watts Inc. on the wellbore schedule.

Completion filings report 6 formation tops, including Anhydrite, San Andres, Glorieta, Wolfcamp.

Its 2 leases have reported 295K barrels of oil and 212K mcf of gas since January 1993, last reporting in July 2026. The leases carry 10 wells, so these are lease totals, not this well alone.

Operator of record

Walsh & Watts Inc.

Permitted by Huber, J. M., Corporation; the EWA schedule now lists a different operator.

Based in
Aledo, TX
P-5 status
Active (A)
P-5 last filed
Dec 2, 2025
Permits on file
361
Phone
(469) 428-3381

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleFasken Oil and Ranch Ltd.
Production reportsWalsh & Watts, Inc.through Feb 2020
Latest permitHuber, J. M., CorporationSep 30, 1994

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,800
total depth, ft
1
permits on file
Sep 30, 1994
last permit issued
Dec 6, 1994
completed
295K
cumulative oil, bbl
212K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 6, 1994
Shut in
Aug 1, 2009
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
King "B" O-11-68026Buenos (Consolidated)Walsh & Watts, Inc.8140K119KDec 1998 – Jul 2026
King O-11-66801Buenos (Strawn)Fasken Oil and Ranch, Ltd.2155K93.3KJan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Huber, J. M., CorporationJan 1993 → Nov 1997
  2. 2Fasken Oil and Ranch, Ltd.Dec 1997 → Dec 2003
  3. 3Walsh & Watts, Inc.Jan 2004 → Feb 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
428612-99DrillHuber, J. M., CorporationSep 29, 1994Sep 30, 1994Oct 27, 19949,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 6, 1994King B O-11-68026Buenos (Consolidated)Walsh & Watts Inc.Shut IN · shut in Aug 1, 20098,800
Dec 6, 1994King O-11-66801Buenos (Strawn)Fasken Oil and Ranch Ltd.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,738 ft elevation.Download CSV →

FormationMD ftSubsea
Anhydrite1,0581,680
San Andres2,64395
Glorieta3,767-1,029
WolfcampWOLFCAMP SH6,862-4,124
L. Strawn A8,074-5,336
Ellenburger8,737-5,999

Perforations

Perforated and open-hole intervals.

FromToType
8,1138,127Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37528017.5250 S
8.6252,915111,100 S
5.58,8007.875415 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 14, 1999Dec 23, 1994Yes
00Feb 7, 1995Dec 23, 1994Yes
00Jan 11, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16933274, documented in the API reference.