WELL · 42-169-33696 · DISTRICT 8

Kirkpatrick #11W

Y

Garza County · Rocker -a- (Wichita Albany) field · Injection  · Vertical

Kirkpatrick #11W (API 42-169-33696) is a well in Garza County operated by Mcclure Oil Company Inc., completed August 20, 2022 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued March 7, 2003, permitted to 5,000 ft.

Completion filings report 3 formation tops, including San Andres, Glorieta, Wichita-Albany.

Its lease has reported 1.63M barrels of oil and 357K mcf of gas since January 1993, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 51.1K barrels injected in the 12 months reported through May 2025.

Operator of record

McClure Oil Company Inc.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Dec 4, 2025
Permits on file
343
Phone
(432) 683-2787

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleMcClure Oil Company Inc.
Production reportsMcClure Oil Company, Inc.through Apr 2026
Latest permitMcClure Oil Company, Inc.Mar 7, 2003
5,000
total depth, ft
1
permits on file
Mar 7, 2003
last permit issued
Aug 20, 2022
completed
1.63M
cumulative oil, bbl
357K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 20, 2022
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kirkpatrick O-11-66204Rocker -a- (Wichita Albany)McClure Oil Company, Inc.101.63M357KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 14,201 · prior 12 14,619(-3%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Fina Oil & Chemical CompanyJan 1993 → Aug 1998
  2. 2McClure Oil Company, Inc.Sep 1998 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
529300-99DrillMcClure Oil Company, Inc.Mar 7, 2003Mar 7, 2003Mar 26, 20035,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-66204————

Formation tops

As filed on W-2/G-1. Subsea from 2,322 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres2,074248
Glorieta2,979-657
Wichita-AlbanyWICHITA ALBANY4,820-2,498

Perforations

Perforated and open-hole intervals.

FromToType
4,8204,834Perforated
4,8374,843Perforated
4,8374,870Perforated
4,8434,870Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37526417.5255 S
8.6252,24811380 S
5.55,0007.875205 S
5.5—7.875430 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 28, 2024Aug 24, 2022—
00Mar 22, 2005Nov 3, 2004—
00Aug 11, 2003May 16, 2003Yes
00Jul 3, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

51.1K
bbl, last 12 reported months
1.48M
bbl, all reported
May 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000092947H-1 InjectionActive1,0002,0004,750–4,950

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 51,070 · prior 12 48,510(+5%)

02K4K6K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/16933696, documented in the API reference.