TEXAS · WELLS · GLASSCOCK COUNTY · POWELL, E.L. LEASE · API 42-173-31889 · DISTRICT 7B

Powell E.L. #5

Plugged

Glasscock County · Dewey Lake (Wolfcamp) field  · Vertical

Powell E.L. #5 (API 42-173-31889) is a plugged well in Glasscock County, plugged July 1, 1993, last operated by Oxy USA Inc..

The RRC has issued one drilling permit, issued August 15, 1985, permitted to 8,900 ft.

It was permitted by Amoco Production Company and has since transferred to Oxy USA Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Rustler, Yates, San Andres, Dean.

Its lease has reported 77.1K barrels of oil and 213K mcf of gas since January 1993, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

OXY USA Inc.

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Jan 26, 2026
Permits on file
3,316
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA Inc.
Production reportsOXY USA Inc.through Mar 2008
Latest permitAmoco Production CompanyAug 15, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,900
total depth, ft
1
permits on file
Aug 15, 1985
last permit issued
Oct 3, 1985
completed
77.1K
cumulative oil, bbl
213K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 3, 1985
Shut in
—
Plugged
Jul 1, 1993

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Powell, E.L. O-10-30173Dewey Lake (Wolfcamp)OXY USA Inc.277.1K213KJan 1993 – Mar 2008

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyAug 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Mar 2008

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
282663-99DrillAmoco Production CompanyAug 15, 1985Aug 15, 1985Aug 30, 19858,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 3, 1985Powell E.L. O-10-30173Dewey Lake (Wolfcamp)OXY USA Inc.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,541 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,1301,411
Yates1,950591
San Andres3,320-779
Dean7,830-5,289
Wolfcamp8,240-5,699
Wolfcamp8,310-5,769

Perforations

Perforated and open-hole intervals.

FromToType
8,2888,304Perforated
8,3108,318Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37535517.5400 S
8.6253,37012.251,150 S
5.58,5257.8751,250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Apr 20, 1989Apr 3, 1989—
00Nov 5, 1985Oct 17, 1985Yes
00Oct 29, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17331889, documented in the API reference.