WELL · 42-173-37187 · DISTRICT 8

Central Facility #2D

Y

Glasscock County · Spraberry (Trend Area) field · Injection  · Vertical

Central Facility #2D (API 42-173-37187) is a well in Glasscock County operated by Hannathon Petroleum II LLC, completed November 19, 2021 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 1, 2015, permitted to 15,000 ft.

It was permitted by Energen Resources Corporation and has since transferred to Hannathon Petroleum II LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Santa Rosa, Yates, Seven Rivers, Queen.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 898K barrels injected in the 12 months reported through January 2026.

Operator of record

Hannathon Petroleum II LLC

Permitted by Energen Resources Corporation; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Mar 4, 2026
Permits on file
107
Phone
(713) 357-9663

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHannathon Petroleum II LLC
Production reportsnone
Latest permitEnergen Resources CorporationJun 1, 2015

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
1
permits on file
Jun 1, 2015
last permit issued
Nov 19, 2021
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2014 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 19, 2021
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Central Facility O-10-46157Spraberry (Trend Area)Hannathon Petroleum II, LLC200Mar 2014 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
807018-99DrillEnergen Resources CorporationMay 29, 2015Jun 1, 2015Jul 10, 201515,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-46157————

Formation tops

As filed on W-2/G-1. Subsea from 2,713 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa1,0001,713
Yates1,2501,463
Seven Rivers1,3001,413
Queen1,5001,213
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO1,850863
Glorieta2,450263
Clear ForkCLEARFORK2,65063
Grayburg2,850-137
Spraberry6,036-3,323
Wichita-AlbanyWICHITA ALBANY7,141-4,428
Ellenburger10,745-8,032

Perforations

Perforated and open-hole intervals.

FromToType
10,76012,350Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37549817.5500 S
9.6255,60812.251,600 S
712,3778.75300 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 5, 2022Dec 6, 2021—
00Jan 15, 2021Jan 14, 2021—
00Jan 13, 2016Dec 8, 2015—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

898K
bbl, last 12 reported months
8M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000112632W-14 DisposalActive30,0005,35010,745–12,350

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 897,556 · prior 12 1,547,607(-42%)

0100K200K300K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/17337187, documented in the API reference.