WELL · 42-205-30387 · DISTRICT 10
Green #2
Hartley County · Hartley West (Canyon) field · Shut IN · Vertical
Green #2 (API 42-205-30387) is a well in Hartley County operated by Fortay Inc., completed December 5, 2014 and listed as shut in on the RRC schedule.
The RRC has issued one drilling permit, issued November 10, 2014, permitted to 9,000 ft.
Completion filings report 10 formation tops, including Tubb, Brown Dolomite, Wolfcamp, Pennsylvanian.
Its lease has reported 756 barrels of oil since October 2014, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Sunray, TX · P-5 Y, filed Jan 4, 2026 · 59 permits on file · (806) 930-4533
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Fortay Inc. |
| Production reports | Fortay, Inc.through Feb 2018 |
| Latest permit | Fortay, Inc.Nov 10, 2014 |
- 9,000
- total depth, ft
- 1
- permits on file
- Nov 10, 2014
- last permit issued
- Dec 5, 2014
- completed
- 756
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2014 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Dec 5, 2014
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: X
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Green O-14-9379 | Hartley West (Canyon) | Fortay, Inc. | 2 | 756 | 0 | Oct 2014 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Fortay, Inc.Aug 2015 → Feb 2018
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 799892-99 | Drill | Fortay, Inc. | Nov 10, 2014 | Nov 10, 2014 | Nov 21, 2014 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-14-9379 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,908 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| TubbTUBB (RED CAVE) | 2,732 | 1,176 |
| Brown Dolomite | 3,706 | 202 |
| Wolfcamp | 3,706 | 202 |
| Pennsylvanian | 4,745 | -837 |
| Missouri (Cleveland) | 6,372 | -2,464 |
| CanyonCANYON SHALE | 6,518 | -2,610 |
| Granite Wash | 6,710 | -2,802 |
| GlorietaGLORIETA (S HARTLEY) - CORROSIVE | — | — |
| Krider Dolomite | — | — |
| Virgil Lime | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,562 | 6,564 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 701 | 17.5 | 685 S |
| 9.625 | 2,734 | 12.25 | 915 S |
| 5.5 | 7,065 | 8.75 | 255 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 2015 | Aug 10, 2015 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-205-30387 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-205-30387 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/20530387, documented in the API reference.