TEXAS · WELLS · HASKELL COUNTY · DAVIS LEASE · API 42-207-31857 · DISTRICT 6E

Davis #1

Plugged

Haskell County · Humphrey-Chapman field  · Vertical

Davis #1 (API 42-207-31857) is a plugged well in Haskell County, plugged April 25, 2002, last operated by Bridwell Oil CO..

The RRC has issued one drilling permit, issued March 27, 1987, permitted to 6,500 ft.

It was permitted by American Cascade Energy, Inc. and has since transferred to Bridwell Oil CO. on the wellbore schedule.

Completion filings report 3 formation tops, including Bunger, Canyon, Strawn.

Its lease has reported 38.1K barrels of oil and 62 mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Bridwell Oil Co.

Permitted by American Cascade Energy, Inc.; the EWA schedule now lists a different operator.

Based in
Wichita Falls, TX
P-5 status
Active (A)
P-5 last filed
Jan 7, 2026
Permits on file
1,146
Phone
(940) 723-4351

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBridwell Oil Co.
Production reportsBridwell Oil Co.through Apr 2026
Latest permitAmerican Cascade Energy, Inc.Mar 27, 1987

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Mar 27, 1987
last permit issued
Jun 15, 1987
completed
38.1K
cumulative oil, bbl
62
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 15, 1987
Shut in
—
Plugged
Apr 25, 2002

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Davis O-8-24493Humphrey-ChapmanBridwell Oil Co.238.1K62Jan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,014 · prior 12 263(+286%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1American Cascade Energy, Inc.Jan 1993 → Oct 1996
  2. 2Red-Tex Petroleum, Inc.May 1997 → Sep 1998
  3. 3Goopco, Inc.Oct 1998 → May 2003
  4. 4Double M Petroproperties, Inc.Jul 2003 → Dec 2005
  5. 5Borderline Operating Corp.Jan 2006 → Jun 2008
  6. 6Ginnings CompanyJul 2008 → May 2013
  7. 7Bridwell Oil Co.Jun 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
328362-99DrillAmerican Cascade Energy, Inc.Mar 27, 1987Mar 27, 1987—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 15, 1987Davis O-8-24493Humphrey-ChapmanBridwell Oil Co.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 1,469 ft elevation.Download CSV →

FormationMD ftSubsea
Bunger2,450-981
Canyon2,820-1,351
Strawn4,300-2,831

Perforations

Perforated and open-hole intervals.

FromToType
2,5062,510Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.71419012.25120 S
4.52,8757.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 27, 1987Jul 28, 1987Yes
00Aug 26, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20731857, documented in the API reference.