WELL · 42-207-32121 · DISTRICT 7

Norman B #1

Plugged

Haskell County · Rule West (Strawn) field  · Vertical

Norman B #1 (API 42-207-32121) is a plugged well in Haskell County, plugged December 10, 2018, last operated by Tkp Petroleum Inc..

The RRC has issued one drilling permit, issued January 2, 1991, permitted to 5,999 ft.

Completion filings report 3 formation tops, including Canyon, Strawn, Dabney Sand.

Its 2 leases have reported 355K barrels of oil since January 1993, last reporting in July 2026. The leases carry 19 wells, so these are lease totals, not this well alone.

Operator of record

TKP Petroleum Inc.

Based in
Lubbock, TX
P-5 status
Delinquent (D)
P-5 last filed
May 29, 2025
Permits on file
106
Phone
(806) 543-0667

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTKP Petroleum Inc.
Production reportsBridwell Oil Co.through Apr 2026
Latest permitTKP Petroleum, Inc.Jan 2, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

5,999
total depth, ft
1
permits on file
Jan 2, 1991
last permit issued
Feb 1, 1991
completed
355K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 1, 1991
Shut in
—
Plugged
Dec 10, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 19 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rule West Unit O-8-28428Rule West (Strawn)Bridwell Oil Co.18355K0Apr 1998 – Jul 2026
Norman "B" O-8-26127Rule West (Strawn)TKP Petroleum, Inc.100Jan 1993 – Aug 2003

Oil, barrels lease total

Last 12 months 13,074 · prior 12 12,715(+3%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Bridwell Oil Co.Apr 1998 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
382789-99DrillTKP Petroleum, Inc.Dec 28, 1990Jan 2, 1991Dec 29, 19905,999

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-8-26127————
—— O-8-28428————

Formation tops

As filed on W-2/G-1. Subsea from 1,567 ft elevation.Download CSV →

FormationMD ftSubsea
Canyon3,865-2,298
StrawnSTRAWN SD.4,548-2,981
StrawnSTRAWN SD.4,696-3,129
Dabney Sand4,945-3,378

Perforations

Perforated and open-hole intervals.

FromToType
4,5484,580Perforated
4,6964,730Perforated
4,9745,040Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62510112.2595 S
4.54,9747.875150 S
4.54,9757.875150 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 15, 1998Jun 9, 1998—
00Apr 13, 1998Mar 13, 1991—
00May 8, 1991Mar 13, 1991—
00Mar 28, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
158K
bbl, all reported
Sep 2004
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000074780H-1 InjectionPlugged Dec 14, 20185001,0004,975–5,040

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120032004

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/20732121, documented in the API reference.