WELL · 42-219-34308 · DISTRICT 8

Slaughter G #56

N

Hockley County · Sundown (Cisco) field  · Vertical

Slaughter G #56 (API 42-219-34308) is a well in Hockley County operated by Altura Energy Ltd., completed September 6, 1984.

The RRC has issued one drilling permit, issued April 2, 1984, permitted to 12,500 ft.

It was permitted by Amoco Production Company and has since transferred to Altura Energy Ltd. on the wellbore schedule.

Completion filings report 9 formation tops, including Rustler, San Andres, Glorieta, Cisco.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit.

Operator of record

Altura Energy Ltd.

Permitted by Amoco Production Company; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Dec 3, 1999 · 569 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAltura Energy Ltd.
Production reportsnone
Latest permitAmoco Production CompanyApr 2, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
1
permits on file
Apr 2, 1984
last permit issued
Sep 6, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 6, 1984
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Slaughter Consolidated O-11-68018Sundown (Cisco)Hilcorp Energy Company200Jan 1999 – Jul 2026
Slaughter "G" O-11-62208Sundown (Cisco)Altura Energy Ltd.200Jan 1993 – Jan 1999

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
234126-99DrillAmoco Production CompanyNov 5, 1984Apr 2, 1984Jul 11, 198412,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-62208————
—— O-11-68018————

Formation tops

As filed on W-2/G-1. Subsea from 3,511 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler2,2291,282
RustlerRUSTLER ANHYDRITE2,2291,282
San Andres4,104-593
Glorieta5,654-2,143
Cisco9,864-6,353
Atoka11,021-7,510
Mississippian11,394-7,883
Woodford11,955-8,444
Fusselman11,993-8,482
Ellenburger12,306-8,795

Perforations

Perforated and open-hole intervals.

FromToType
12,01312,500Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37548217.5475 S
8.6255,630111,725 S
5.512,0137.8751,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 18, 2024Jan 2, 2024—
00Dec 16, 1998Oct 17, 1984—
00Dec 14, 1984Oct 17, 1984—
00Dec 7, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.44M
bbl, all reported
Mar 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000054883W-14 DisposalActive10,0002,10011,700–12,600

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21934308, documented in the API reference.