TEXAS · WELLS · HOCKLEY COUNTY · EDWARDS, J. S. LEASE · API 42-219-34891 · DISTRICT 7B
Edwards J. S. #1
Hockley County · Palm Sunday (Clearfork) field · Injection · Vertical
Edwards J. S. #1 (API 42-219-34891) is a well in Hockley County operated by Texland Petroleum L.P., completed September 29, 2020 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued December 2, 1985, permitted to 6,461 ft.
It was permitted by Texland-Rector & Schumacher and has since transferred to Texland Petroleum L.P. on the wellbore schedule.
Completion filings report 2 formation tops, including Glorieta, Clear Fork.
Its lease has reported 92.6K barrels of oil and 354 mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 76.4K barrels injected in the 12 months reported through March 2026.
Operator of record
Permitted by Texland-Rector & Schumacher; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Oct 15, 2025
- Permits on file
- 694
- Phone
- (817) 336-2751
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texland Petroleum L.P. |
| Production reports | Texland Petroleum, L.P.through Apr 2026 |
| Latest permit | Texland-Rector & SchumacherDec 2, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,461
- total depth, ft
- 1
- permits on file
- Dec 2, 1985
- last permit issued
- Sep 29, 2020
- completed
- 92.6K
- cumulative oil, bbl
- 354
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1993 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 29, 2020
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Edwards, J. S. O-11-65784 | Palm Sunday (Clearfork) | Texland Petroleum, L.P. | 2 | 92.6K | 354 | Jan 1993 – Apr 2026 |
Oil, barrels lease total
Last 12 months 1,221 · prior 12 1,277(-4%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texland-Rector & SchumacherSep 1993 → Nov 2000
- 2Texland Petroleum Inc.Dec 2000 → Mar 2003
- 3Texland Petroleum, L.P.Apr 2003 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 292002-99 | Drill | Texland-Rector & Schumacher | Nov 27, 1985 | Dec 2, 1985 | — | 6,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 29, 2020 | Edwards J. S. O-11-65784 | Palm Sunday (Clearfork) | Texland Petroleum L.P. | Injection | 6,461 |
Formation tops
As filed on W-2/G-1. Subsea from 3,421 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glorieta | 5,620 | -2,199 |
| GlorietaGLORIETTA | 5,620 | -2,199 |
| Clear ForkUPPER CLEARFORK | 6,302 | -2,881 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,968 | 4,994 | Perforated |
| 6,346 | 6,397 | Perforated |
| 6,346 | 6,461 | Open hole |
| 6,405 | 6,461 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 435 | 17.5 | 400 S |
| 8.625 | 2,166 | 7.875 | 150 S |
| 8.625 | 2,166 | 12.25 | 150 S |
| 5.5 | 6,405 | 7.875 | 1,750 S |
| 5.5 | 6,405 | 12.25 | 1,750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 15, 2024 | Sep 6, 2023 | — |
| 00 | May 20, 1994 | Apr 11, 1994 | — |
| 00 | Mar 5, 1987 | Feb 18, 1987 | Yes |
| 00 | May 12, 1986 | May 5, 1986 | Yes |
| 00 | May 9, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-219-34891 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-219-34891 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 76.4K
- bbl, last 12 reported months
- 2.12M
- bbl, all reported
- Mar 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000061295 | H-1 Injection | Active | 1,000 | 2,000 | 6,340–6,461 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 76,429 · prior 12 68,069(+12%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21934891, documented in the API reference.