TEXAS · WELLS · HOCKLEY COUNTY · MAGERS LEASE · API 42-219-36106 · DISTRICT 7B
Magers #1
Hockley County · Linker (Clear Fork) field · Vertical
Magers #1 (API 42-219-36106) is a plugged well in Hockley County, plugged July 31, 1997, last operated by Wheeler Operating Corporation.
The RRC has issued one drilling permit, issued July 14, 1994, permitted to 8,400 ft.
Completion filings report 4 formation tops, including San Andres, Glorieta, Top - Upper Clearfork, Top - Lower Clearfork.
Its lease has reported 6.61K barrels of oil and 3.5K mcf of gas since October 1994, last reporting in October 1997. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 25, 2025
- Permits on file
- 330
- Phone
- (817) 917-5697
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wheeler Operating Corporation |
| Production reports | Wheeler Operating Corporationthrough May 1997 |
| Latest permit | Wheeler Operating CorporationJul 14, 1994 |
- 8,400
- total depth, ft
- 1
- permits on file
- Jul 14, 1994
- last permit issued
- Oct 31, 1994
- completed
- 6.61K
- cumulative oil, bbl
- 3.5K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 1994 THROUGH Oct 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 31, 1994
- Shut in
- —
- Plugged
- Jul 31, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Magers O-11-67313 | Linker (Clear Fork) | Wheeler Operating Corporation | 2 | 6.61K | 3.5K | Oct 1994 – Oct 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wheeler Operating CorporationNov 1994 → May 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 425875-99 | Drill | Wheeler Operating Corporation | Jul 14, 1994 | Jul 14, 1994 | Aug 12, 1994 | 8,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 31, 1994 | Magers O-11-67313 | Linker (Clear Fork) | Wheeler Operating Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,498 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San AndresSAN ANDRES POROSITY | 5,152 | -1,654 |
| GlorietaGLORIETA SAND | 5,670 | -2,172 |
| Top - Upper Clearfork | 6,227 | -2,729 |
| Top - Lower Clearfork | 7,076 | -3,578 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,284 | 7,566 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 446 | 12.25 | 250 S |
| 5.5 | 6,494 | 7.875 | 2,300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Dec 2, 1994 | Nov 7, 1994 | Yes |
| 00 | Nov 17, 1994 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-219-36106 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-219-36106 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21936106, documented in the API reference.