TEXAS · WELLS · HOCKLEY COUNTY · JACKSON, BOBBY LEASE · API 42-219-36133 · DISTRICT 7B

Jackson Bobby #2W

Plugged

Hockley County · Linker (Clear Fork) field  · Vertical

Jackson Bobby #2W (API 42-219-36133) is a plugged well in Hockley County, plugged September 18, 1997, last operated by Wheeler Operating Corporation.

The RRC has issued one drilling permit, issued November 8, 1994, permitted to 8,800 ft.

Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.

Its lease has reported 702 barrels of oil and 296 mcf of gas since September 1994, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Wheeler Operating Corporation

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Sep 25, 2025
Permits on file
330
Phone
(817) 917-5697

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleWheeler Operating Corporation
Production reportsWheeler Operating Corporationthrough May 1997
Latest permitWheeler Operating CorporationNov 8, 1994
8,800
total depth, ft
1
permits on file
Nov 8, 1994
last permit issued
Dec 31, 1994
completed
702
cumulative oil, bbl
296
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH May 1997

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 31, 1994
Shut in
—
Plugged
Sep 18, 1997

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jackson, Bobby O-11-67294Linker (Clear Fork)Wheeler Operating Corporation2702296Sep 1994 – May 1997

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wheeler Operating CorporationSep 1994 → May 1997

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
429689-99DrillWheeler Operating CorporationNov 3, 1994Nov 8, 1994Nov 13, 19948,800

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 31, 1994Jackson Bobby O-11-67294Linker (Clear Fork)Wheeler Operating CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 3,493 ft elevation.Download CSV →

FormationMD ftSubsea
San AndresSAN ANDRES POROSITY5,126-1,633
GlorietaTOP OF GLORIETA5,636-2,143
Clear ForkUPPER CLEARFORK6,193-2,700
Clear ForkLOWER CLEARFORK6,902-3,409

Perforations

Perforated and open-hole intervals.

FromToType
7,2207,492Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,22212.251,100 S
5.57,0027.8751,550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 27, 1995Mar 10, 1995Yes
00Feb 16, 1995Jan 24, 1995—
00Feb 2, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

110K
bbl, last 12 reported months
286K
bbl, all reported
Mar 1997
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000082486H-1 InjectionPlugged Oct 17, 19978003,5007,100–7,900

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 110,201 · prior 12 162,021(-32%)

010K20K19961997

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21936133, documented in the API reference.