TEXAS · WELLS · HOCKLEY COUNTY · NEAL, RUBY LEASE · API 42-219-36148 · DISTRICT 7B
Neal Ruby #5
Hockley County · Linker (Clear Fork) field · Vertical
Neal Ruby #5 (API 42-219-36148) is a plugged well in Hockley County, plugged September 23, 1997, last operated by Wheeler Operating Corporation.
The RRC has issued one drilling permit, issued March 29, 1995, permitted to 9,000 ft.
Completion filings report 3 formation tops, including San Andres, Glorieta, Clear Fork.
Its lease has reported 528 barrels of oil and 233 mcf of gas since June 1995, last reporting in November 1997.
Operator of record
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Sep 25, 2025
- Permits on file
- 330
- Phone
- (817) 917-5697
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Wheeler Operating Corporation |
| Production reports | Wheeler Operating Corporationthrough May 1997 |
| Latest permit | Wheeler Operating CorporationMar 29, 1995 |
- 9,000
- total depth, ft
- 1
- permits on file
- Mar 29, 1995
- last permit issued
- Jun 14, 1995
- completed
- 528
- cumulative oil, bbl
- 233
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 1995 THROUGH Nov 1997
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 14, 1995
- Shut in
- —
- Plugged
- Sep 23, 1997
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Neal, Ruby O-11-67418 | Linker (Clear Fork) | Wheeler Operating Corporation | 1 | 528 | 233 | Jun 1995 – Nov 1997 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wheeler Operating CorporationJun 1995 → May 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 434244-99 | Drill | Wheeler Operating Corporation | Mar 28, 1995 | Mar 29, 1995 | May 23, 1995 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 14, 1995 | Neal Ruby O-11-67418 | Linker (Clear Fork) | Wheeler Operating Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 3,512 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| San AndresSAN ANDRES POROSITY | 4,972 | -1,460 |
| GlorietaTOP OF GLORIETA | 5,482 | -1,970 |
| Clear ForkUPPER CLEARFORK | 5,985 | -2,473 |
| Clear ForkLOWER CLEARFORK | 6,837 | -3,325 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,002 | 7,976 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,209 | 12.25 | 1,100 S |
| 5.5 | 8,064 | 7.875 | 1,450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 11, 1995 | Jul 24, 1995 | Yes |
| 00 | Jul 31, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-219-36148 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-219-36148 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/21936148, documented in the API reference.