WELL · 42-219-36308 · DISTRICT 8

Caddell #1AR

N

Hockley County  · Horizontal · Sidetrack

Caddell #1AR (API 42-219-36308) is a permitted horizontal well in Hockley County filed by Rocker A Operating Company; no completion report is on file yet.

The RRC has issued 3 drilling permits (amended once) between 1996 and 2013, permitted to 11,800 ft.

Completion filings report 7 formation tops, including San Andres, Glorieta, Clear Fork, Lwr Clearfork.

Its 2 leases have reported 83.8K barrels of oil and 18.3K mcf of gas since March 1997, last reporting in March 2019. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Rocker a Operating Company

Post, TX · P-5 Y, filed Mar 6, 2023 · 274 permits on file · (806) 495-5165

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsRocker a Operating Companythrough Apr 2018
Latest permitRocker a Operating CompanyJul 17, 2013
11,800
total depth, ft
4
permits on file
Jul 17, 2013
last permit issued
—
completed
83.8K
cumulative oil, bbl
18.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1997 THROUGH Mar 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caddell AR O-11-70114Linker (Clear Fork)Rocker a Operating Company17.29K8.17KApr 2012 – Mar 2019
Caddell O-11-67720Clauene, NW. (Canyon)Rocker a Operating Company276.5K10.1KMar 1997 – Jul 2014

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Midland Res. Oper. Co., Inc.Mar 1997 → Oct 1998
  2. 2Vista Resources, Inc. (A)Nov 1998 → Feb 2000
  3. 3Prize Operating CompanyMar 2000 → Mar 2002
  4. 4Gruy Petroleum Management Co.Apr 2002 → Aug 2002
  5. 5Scythian, Ltd.Sep 2002 → Feb 2004
  6. 6Rocker a Operating CompanySep 2004 → Apr 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
763568-99RecompletionRocker a Operating CompanyMay 29, 2013Jul 17, 2013Nov 23, 200410,409
472179-98Recompletion · sidetrackMidland Res. Oper. Co., Inc.Oct 8, 1998Jan 13, 1998—10,403
472179-99RecompletionMidland Res. Oper. Co., Inc.Jan 13, 1998Jan 13, 1998—10,500
456172-99DrillMidland Res. Oper. Co., Inc.Dec 11, 1996Dec 11, 1996Dec 31, 199611,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-67720————
—— O-11-67720————
—— O-11-70114————

Formation tops

As filed on W-2/G-1. Subsea from 3,510 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres5,120-1,610
Glorieta5,910-2,400
Clear ForkUPPER CLEARFORK6,350-2,840
Clear ForkLOWER CLEARFORK7,080-3,570
LWR Clearfork7,080-3,570
Wolfcamp8,750-5,240
Canyon9,696-6,186
Strawn10,237-6,727

Perforations

Perforated and open-hole intervals.

FromToType
7,3507,700Perforated
9,7099,714Perforated
9,7099,727Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37546017.5420 S
8.6254,49812.251,370 S
5.59,8307.875513 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 6, 2014Jul 29, 2013—
00Jun 26, 1998Apr 13, 1998Yes
00Jun 17, 1998Apr 18, 1997Yes
00Jun 17, 1997Apr 18, 1997Yes
00May 30, 1997——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21936308, documented in the API reference.