WELL · 42-219-36520 · DISTRICT 8

Pickard Estate #1

N

Hockley County  · Vertical

Pickard Estate #1 (API 42-219-36520) is a disposal or injection well in Hockley County operated by Wheeler Operating Corporation under an active UIC permit.

The RRC has issued 2 drilling permits (amended twice) in 2000, permitted to 12,000 ft.

Completion filings report 6 formation tops, including San Andres, Glorieta, Clear Fork, Wichita-Albany.

Its lease has reported 4.92K barrels of oil and 2.65K mcf of gas since August 2000, last reporting in July 2026.

It holds an active disposal or injection permit, with 511K barrels injected in the 12 months reported through March 2025.

Operator of record

Wheeler Operating Corporation

Fort Worth, TX · P-5 Y, filed Jun 4, 2026 · 330 permits on file · (817) 917-5697

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsRocker a Operating Companythrough Oct 2002
Latest permitWheeler Operating CorporationNov 29, 2000
12,000
total depth, ft
4
permits on file
Nov 29, 2000
last permit issued
—
completed
4.92K
cumulative oil, bbl
2.65K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pickard Estate O-11-68216Clauene, North (Canyon 9700)Westridge Resources, Inc.14.92K2.65KAug 2000 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Wheeler Operating CorporationAug 2000 → Jul 2002
  2. 2Rocker a Operating CompanyAug 2002 → Oct 2002

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
501964-99RecompletionWheeler Operating CorporationNov 15, 2000Nov 29, 2000—12,000
494290-97DrillWheeler Operating CorporationAug 8, 2000Apr 19, 2000May 31, 200011,000
494290-98DrillWheeler Operating CorporationMay 18, 2000Apr 19, 2000—11,000
494290-99DrillWheeler Operating CorporationApr 19, 2000Apr 19, 2000—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-11-68216————

Formation tops

As filed on W-2/G-1. Subsea from 3,510 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres5,170-1,660
San AndresSAN ANDRES POROSITY5,170-1,660
GlorietaGLORIETTA5,726-2,216
Clear ForkUPPER CLEARFORK6,264-2,754
Wichita-AlbanyWICHITA ALBANY7,430-3,920
Wolfcamp8,240-4,730
Canyon9,696-6,186
CanyonTOP OF CANYON9,708-6,198

Perforations

Perforated and open-hole intervals.

FromToType
8,2568,286Perforated
8,2569,920Perforated
8,4208,452Perforated
9,6219,716Perforated
9,6969,716Perforated
9,7319,920Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,24412.25850 S
5.57,8007.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 2024Mar 29, 2024—
00May 19, 2009Mar 5, 2009—
00Oct 24, 2000Aug 11, 2000Yes
00Aug 31, 2000——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

511K
bbl, last 12 reported months
8.57M
bbl, all reported
Mar 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000093316H-1 InjectionActive5,0002,2004,900–9,950

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 510,888 · prior 12 620,651(-18%)

050K100K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21936520, documented in the API reference.