TEXAS · WELLS · HOCKLEY COUNTY · MAY-MONTGOMERY UNIT LEASE · API 42-219-36878 · DISTRICT 7B

May-Montgomery Unit #95

Shut in

Hockley County · Levelland field · Shut In  · Vertical

May-Montgomery Unit #95 (API 42-219-36878) is a well in Hockley County operated by Hilcorp Energy Company, completed December 17, 2009 and listed as shut in on the RRC schedule, shut in August 1, 2012.

The RRC has issued one drilling permit, issued December 21, 2005, permitted to 4,881 ft.

It was permitted by Occidental Permian Ltd. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 5 formation tops, including Rustler, Yates, Queen, Grayburg.

Its lease has reported 4.93M barrels of oil and 1.58M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 87 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

Hilcorp Energy Company

Permitted by Occidental Permian Ltd.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,458
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitOccidental Permian Ltd.Dec 21, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,881
total depth, ft
1
permits on file
Dec 21, 2005
last permit issued
Dec 17, 2009
completed
4.93M
cumulative oil, bbl
1.58M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 17, 2009
Shut in
Aug 1, 2012
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 87 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
May-Montgomery Unit O-11-18451LevellandHilcorp Energy Company874.93M1.58MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 39,819 · prior 12 48,372(-18%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 18,335 · prior 12 20,184(-9%)

01K2K3K202420252026

Wells named May-Montgomery Unit

Hilcorp Energy Company's other wells filed under this lease name in Hockley County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Amoco Production CompanyJan 1993 → Feb 1997
  2. 2Altura Energy Ltd.Mar 1997 → Apr 2000
  3. 3Occidental Permian Ltd.May 2000 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
611397-99DrillOccidental Permian Ltd.Dec 21, 2005Dec 21, 2005Jan 18, 20065,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 17, 2009May-Montgomery Unit O-11-18451LevellandHilcorp Energy CompanyShut In · shut in Aug 1, 20124,881

Formation tops

As filed on W-2/G-1. Subsea from 3,566 ft elevation.Download CSV →

FormationMD ftSubsea
RustlerRUSTLER ANHYDRITE2,0761,490
Yates2,612954
Yates2,614952
Queen2,738828
Grayburg3,616-50
Grayburg3,641-75
San Andres3,774-208
San Andres3,828-262

Perforations

Perforated and open-hole intervals.

FromToType
4,7784,792Perforated
4,7784,837Perforated
4,7984,837Perforated
4,8404,860Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62544612.25450 S
5.54,8817.875950 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 6, 2025Jan 4, 2025—
00Feb 14, 2007Aug 16, 2006Yes
00Sep 27, 2006——

Well logs

1 log loaded from the RRC's log index, the latest received Feb 22, 2007. Cased hole, Gamma ray, Neutron. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
Neutron PorosityCOMPENSATED NEUTRON GAMMA RAY CCLSpans Rustler, Yates, Queen, Grayburg, San AndresTIFF0 to 4,870Feb 22, 2007run Jul 11, 2006—

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
204K
bbl, all reported
Feb 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096134H-1 InjectionActive5,0002,2754,550–5,200

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/21936878, documented in the API reference.