TEXAS · WELLS · HOWARD COUNTY · API 42-227-33530 · DISTRICT 7B

Batjer Patti -C- #8

Plugged

Howard County · Howard Glasscock (Consolidated) field  · Vertical

Batjer Patti -C- #8 (API 42-227-33530) is a plugged well in Howard County, plugged July 11, 2017, last operated by Grayrock Energy II LLC.

The RRC has issued one drilling permit, issued October 17, 1984, permitted to 4,000 ft.

It was permitted by Exxon Corp. and has since transferred to Grayrock Energy II LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Seven Rivers, Glorieta, Mi. Clearfork.

Its 2 leases have reported 203K barrels of oil and 153 mcf of gas since January 1993, last reporting in July 2026. The leases carry 16 wells, so these are lease totals, not this well alone.

Operator of record

Grayrock Energy II LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Phone
(214) 234-9115

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGrayrock Energy II LLC
Production reportsGrayrock Energy II, LLCthrough Apr 2026
Latest permitExxon Corp.Oct 17, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

4,000
total depth, ft
1
permits on file
Oct 17, 1984
last permit issued
Jan 6, 1985
completed
203K
cumulative oil, bbl
153
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jan 6, 1985
Shut in
—
Plugged
Jul 11, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 16 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Batjer, Patti -C- O-10-41851Howard Glasscock (Consolidated)Grayrock Energy II, LLC888.7K0Dec 2011 – Jul 2026
Batjer, Patti -C- O-10-29268Howard Glasscock (Clear Fork,mi)Endeavor Energy Resources L.P.8115K153Jan 1993 – Oct 2012

Oil, barrels lease total

Last 12 months 7,119 · prior 12 7,303(-3%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exxon Corp.Jan 1993 → Sep 1994
  2. 2Stephens, Autry C.Oct 1994 → Aug 2000
  3. 3Endeavor Energy Resources L.P.Sep 2000 → Jan 2021
  4. 4Oak Prairie Operations, LLCFeb 2021 → Aug 2024
  5. 5Grayrock Energy II, LLCSep 2024 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
254881-99DrillExxon Corp.Oct 17, 1984Oct 17, 1984—4,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jan 6, 1985Batjer Patti -C- O-10-41851Howard Glasscock (Consolidated)Grayrock Energy II LLCPlugged—
Jan 6, 1985Batjer Patti -C- O-10-29268Howard Glasscock (Clear Fork MI)Endeavor Energy Resources L.P.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,356 ft elevation.Download CSV →

FormationMD ftSubsea
Seven Rivers1,2541,102
GlorietaGLORIETTA2,718-362
Mi. Clearfork3,448-1,092

Perforations

Perforated and open-hole intervals.

FromToType
3,4643,730Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,12012.25525 S
4.53,9347.8751,260 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 9, 2012Jan 24, 1985—
00Feb 13, 1985Jan 24, 1985—
00Feb 7, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22733530, documented in the API reference.