WELL · 42-227-34113 · DISTRICT 8

8410 JV-P Mayfield #1

Plugged

Howard County · Luther SE. (Silurian-Devonian) field  · Vertical

8410 JV-P Mayfield #1 (API 42-227-34113) is a plugged well in Howard County, plugged December 18, 1991, last operated by Bta Oil Producers.

The RRC has issued 2 drilling permits between 1986 and 2002, permitted to 10,053 ft.

It was permitted by Dominion Oklahoma Texas E&P, Inc and has since transferred to Bta Oil Producers on the wellbore schedule.

Completion filings report 5 formation tops, including Yates, San Andres, Wolfcamp, Canyon.

It holds an active disposal or injection permit, with 935K barrels injected in the 12 months reported through December 2025.

Operator of record

BTA Oil Producers

Permitted by Dominion Oklahoma Texas E&P, Inc; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Oct 5, 2007 · 684 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBTA Oil Producers
Production reportsnone
Latest permitDominion Oklahoma Texas E&P, IncMay 17, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,053
total depth, ft
2
permits on file
May 17, 2002
last permit issued
Mar 4, 1987
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1999 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 4, 1987
Shut in
—
Plugged
Dec 18, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
8410 JV-P Mayfield O-10-36276Talbot (Canyon)Hibernia Resources IV, LLC100Aug 1999 – Jul 2026
— O-10-31148——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
520126-99ReenterDominion Oklahoma Texas E&P, IncMay 17, 2002May 17, 2002Jan 1, 199610,053
323545-99DrillBTA Oil ProducersMay 23, 1986Nov 24, 1986—10,050

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-31148————
—— O-10-36276————

Formation tops

As filed on W-2/G-1. Subsea from 2,672 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,892780
San Andres3,324-652
Wolfcamp7,560-4,888
Canyon8,615-5,943
CanyonCANYON LMS8,615-5,943
Fusselman9,920-7,248

Perforations

Perforated and open-hole intervals.

FromToType
3,2804,740Perforated
9,9369,950Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37541517.5450 S
8.6253,280111,000 S
5.510,0537.8751,700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 13, 2017Mar 23, 2017—
00Jul 18, 2002May 10, 2002—
00May 9, 2000——
00Apr 20, 1987Mar 24, 1987Yes
00Apr 3, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

935K
bbl, last 12 reported months
14.3M
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000085788W-14 DisposalActive10,0001,6003,280–4,740

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 934,812 · prior 12 943,167(-1%)

050K100K150K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22734113, documented in the API reference.