WELL · 42-227-34219 · DISTRICT 8

Shroyer SWD #1

WaterPlugged

Howard County · Spraberry (Trend Area) field  · Vertical

Shroyer Swd #1 (API 42-227-34219) is a plugged well in Howard County, plugged January 27, 2020, last operated by Surge Operating LLC.

The RRC has issued 2 drilling permits between 1987 and 2012, permitted to 10,700 ft.

It was permitted by Element Petro Operating II, LLC and has since transferred to Surge Operating LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Yates, Spraberry, Canyon, Strawn.

Operator of record

Surge Operating LLC

Permitted by Element Petro Operating II, LLC; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 14, 2026
Permits on file
1,234
Phone
(832) 333-2300

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSurge Operating LLC
Production reportsnone
Latest permitElement Petro Operating II, LLCOct 26, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,700
total depth, ft
2
permits on file
Oct 26, 2012
last permit issued
May 28, 2013
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2013 THROUGH Jul 2020

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 28, 2013
Shut in
—
Plugged
Jan 27, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Shroyer SWD O-10-43969Spraberry (Trend Area)Surge Operating, LLC100May 2013 – Jul 2020

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
749239-99ReenterElement Petro Operating II, LLCOct 3, 2012Oct 26, 2012Apr 9, 20135,500
337530-99DrillAnadarko Petroleum Corp.Oct 16, 1987Oct 20, 1987—10,700

Completions

CompletedLeaseFieldOperatorStatusDepth
May 28, 2013Shroyer SWD O-10-43969Spraberry (Trend Area)Surge Operating LLCPlugged—
Apr 17, 1988Shroyer O-10-31854Shroyer (Fusselman)Anadarko Petroleum CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,680 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,921759
Spraberry6,357-3,677
Canyon8,868-6,188
Strawn9,392-6,712
Mississippian9,746-7,066
Fusselman10,262-7,582

Perforations

Perforated and open-hole intervals.

FromToType
3,9084,924Perforated
10,27610,278Perforated
10,29610,300Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37535517.5370 S
9.6253,61512.251,200 S
75,0068.5450 S
5.510,3987.875360 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 13, 2014Jun 27, 2013—
00Jun 30, 1988Jun 6, 1988Yes
00Jun 24, 1988——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
7.59M
bbl, all reported
Jan 2021
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000106911W-14 DisposalPlugged Feb 25, 202012,0001,9503,900–5,450

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 224,354(-100%)

050K100K150K20202021

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22734219, documented in the API reference.