WELL · 42-227-34928 · DISTRICT 8
Callie 42-A #1A
Howard County · Silver Queen (Penn-Canyon) field · Vertical
Callie 42-A #1A (API 42-227-34928) is a plugged well in Howard County, plugged June 25, 2004, last operated by Patriot Resources Inc..
The RRC has issued 2 drilling permits between 1995 and 2004, permitted to 9,100 ft.
Completion filings report 4 formation tops, including Strawn, Canyon, Mississippian, Ellenburger.
Its lease has reported 74.9K barrels of oil and 129K mcf of gas since August 1995, last reporting in March 2008.
Operator of record
- Based in
- Midland, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Apr 11, 2017
- Permits on file
- 423
- Phone
- (432) 686-9801
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Patriot Resources, Inc.through May 2003 |
| Latest permit | Patriot Resources, Inc.Jan 8, 2004 |
- 9,100
- total depth, ft
- 2
- permits on file
- Jan 8, 2004
- last permit issued
- Aug 16, 1995
- completed
- 74.9K
- cumulative oil, bbl
- 129K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 1995 THROUGH Mar 2008
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 16, 1995
- Shut in
- —
- Plugged
- Jun 25, 2004
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Callie "42-A" O-10-34610 | Silver Queen (Penn-Canyon) | Patriot Resources, Inc. | 1 | 74.9K | 129K | Aug 1995 – Mar 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Baytech, Inc.Aug 1995 → Dec 2002
- 2Patriot Resources, Inc.Jan 2003 → May 2003
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 540489-99 | Recompletion | Patriot Resources, Inc. | Jan 8, 2004 | Jan 8, 2004 | — | 9,000 |
| 437169-99 | Drill | Baytech, Inc. | Jun 22, 1995 | Jun 22, 1995 | Jul 11, 1995 | 9,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Aug 16, 1995 | Callie 42-A O-10-34610 | Silver Queen (Penn-Canyon) | Patriot Resources Inc. | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,682 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| StrawnSTRAWN SANDSTONE | 6,362 | -3,680 |
| CanyonCANYON LIMESTONE | 7,064 | -4,382 |
| StrawnSTRAWN LIMESTONE | 7,106 | -4,424 |
| Mississippian | 7,174 | -4,492 |
| Ellenburger | 7,201 | -4,519 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,846 | 8,851 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 383 | 17.5 | 375 S |
| 8.625 | 3,233 | 11 | 1,400 S |
| 5.5 | 9,000 | 7.875 | 475 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 19, 1995 | Sep 6, 1995 | Yes |
| 00 | Sep 22, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-34928 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-34928 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22734928, documented in the API reference.