TEXAS · WELLS · HOWARD COUNTY · API 42-227-35350 · DISTRICT 7B
Roberts Dora #131W
Howard County · Howard Glasscock (Consolidated) field · Injection · Vertical
Roberts Dora #131W (API 42-227-35350) is a well in Howard County operated by Apache Corporation, completed September 30, 1999 and listed as injection on the RRC schedule.
The RRC has issued one drilling permit, issued July 21, 1999, permitted to 3,038 ft.
It was permitted by Westport Oil And Gas Company Inc and has since transferred to Apache Corporation on the wellbore schedule.
Completion filings report 4 formation tops, including Grayburg, San Andres, Gloreta, Glorieta.
Its 2 leases have reported 1.1M barrels of oil and 39K mcf of gas since January 1993, last reporting in July 2026. The leases carry 120 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit, with 15.8K barrels injected in the 12 months reported through December 2025.
Operator of record
Permitted by Westport Oil and Gas Company Inc; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 3, 2025
- Permits on file
- 9,756
- Phone
- (713) 954-5500
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Apache Corporation |
| Production reports | Apache Corporationthrough Apr 2026 |
| Latest permit | Westport Oil and Gas Company IncJul 21, 1999 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,038
- total depth, ft
- 1
- permits on file
- Jul 21, 1999
- last permit issued
- Sep 30, 1999
- completed
- 1.1M
- cumulative oil, bbl
- 39K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 30, 1999
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 120 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Roberts, Dora O-10-46922 | Howard Glasscock (Consolidated) | Apache Corporation | 61 | 464K | 0 | Dec 2011 – Jul 2026 |
| Roberts, Dora O-10-2821 | Howard Glasscock | Apache Corporation | 59 | 638K | 39K | Jan 1993 – Mar 2016 |
Oil, barrels lease total
Last 12 months 6,092 · prior 12 216(+2720%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chevron U. S. A. Inc.Jan 1993 → Jun 1995
- 2Westport Oil and Gas Company IncJul 1995 → Feb 2002
- 3Westport Oil and Gas Company, LPMar 2002 → Feb 2006
- 4Kerr-McGee Oil & Gas Onshore LPMar 2006 → Mar 2007
- 5Apache CorporationApr 2007 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 485939-99 | Drill | Westport Oil and Gas Company Inc | Jul 19, 1999 | Jul 21, 1999 | Aug 31, 1999 | 3,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 30, 1999 | Roberts Dora O-10-46922 | Howard Glasscock (Consolidated) | Apache Corporation | Injection | 3,038 |
| May 27, 2020 | Roberts Dora O-10-46922 | Howard Glasscock (Consolidated) | Apache Corporation | Not on Schedule | — |
| Sep 30, 1999 | Roberts Dora O-10-46922 | Howard Glasscock (Consolidated) | Apache Corporation | Not on Schedule | — |
| Sep 30, 1999 | Roberts Dora O-10-2821 | Howard Glasscock | Apache Corporation | Not on Schedule | — |
| Sep 30, 1999 | Roberts Dora O-10-2821 | Howard Glasscock | Apache Corporation | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,741 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Grayburg | 2,000 | 741 |
| San Andres | 2,260 | 481 |
| Gloreta | 2,940 | -199 |
| Glorieta | 2,940 | -199 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,320 | 2,510 | Perforated |
| 2,320 | 2,781 | Perforated |
| 2,540 | 2,781 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 371 | 12.25 | 200 S |
| 7 | 3,034 | 8.75 | 250 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 15, 2023 | Apr 7, 2022 | — |
| 00 | Mar 15, 2023 | Oct 26, 1999 | — |
| 00 | Oct 22, 2015 | Feb 11, 2002 | — |
| 00 | Oct 22, 2015 | Oct 26, 1999 | — |
| 00 | Jul 19, 2002 | Feb 11, 2002 | — |
| 00 | Jun 18, 2002 | — | — |
| 00 | Apr 2, 2002 | Oct 26, 1999 | — |
| 00 | Feb 7, 2002 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-35350 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-35350 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 15.8K
- bbl, last 12 reported months
- 8.44M
- bbl, all reported
- Dec 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000089213 | H-1 Injection | Active | 5,000 | 1,000 | 2,000–3,010 |
| 000089214 | H-1 Injection | Canceled Oct 24, 2023 | 1,000 | 1,000 | 2,400–3,000 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 15,766 · prior 12 4,930(+220%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22735350, documented in the API reference.