WELL · 42-227-35799 · DISTRICT 8
Vincent East 66 #1
Howard County · Suerte (Wolfcamp) field · Vertical
Vincent East 66 #1 (API 42-227-35799) is a plugged well in Howard County, plugged July 31, 2017, last operated by Sharp Image Energy Inc..
The RRC has issued 2 drilling permits between 2003 and 2012, permitted to 7,400 ft.
Completion filings report one formation top, including Canyon.
Its 2 leases have reported 122K barrels of oil and 121K mcf of gas since April 2003, last reporting in September 2018. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- Big Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jul 16, 2026
- Permits on file
- 665
- Phone
- (432) 267-3126
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Sharp Image Energy Inc. |
| Production reports | Sharp Image Energy, Inc.through Jul 2017 |
| Latest permit | Sharp Image Energy, Inc.Aug 23, 2012 |
- 7,400
- total depth, ft
- 2
- permits on file
- Aug 23, 2012
- last permit issued
- Sep 2, 2012
- completed
- 122K
- cumulative oil, bbl
- 121K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2003 THROUGH Sep 2018
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 2, 2012
- Shut in
- —
- Plugged
- Jul 31, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Vincent East "66" O-10-37090 | Double "B" (Canyon) | Sharp Image Energy, Inc. | 1 | 102K | 120K | Apr 2003 – Sep 2018 |
| Vincent East 66 O-11-70005 | Suerte (Wolfcamp) | Sharp Image Energy, Inc. | 1 | 19.4K | 1.04K | Sep 2012 – Sep 2018 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Sharp Image Energy, Inc.Apr 2003 → Jul 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 746440-99 | Recompletion | Sharp Image Energy, Inc. | Aug 14, 2012 | Aug 23, 2012 | Aug 17, 2012 | 7,400 |
| 528890-99 | Drill | Sharp Image Energy, Inc. | Feb 26, 2003 | Feb 26, 2003 | Feb 27, 2003 | 7,400 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-70005 | — | — | — | — |
| — | — O-10-37090 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,261 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonCANYON REEF | 7,347 | -5,086 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,923 | 5,926 | Perforated |
| 6,014 | 6,017 | Perforated |
| 7,347 | 7,374 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,390 | 11 | 1,250 S |
| 5.5 | 7,347 | 7.875 | 1,300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 10, 2013 | Oct 8, 2012 | Yes |
| 00 | Jul 8, 2003 | May 14, 2003 | Yes |
| 00 | Jun 25, 2003 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-35799 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-35799 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22735799, documented in the API reference.