TEXAS · WELLS · HOWARD COUNTY · ALLDAY N15 LEASE · API 42-227-35916 · DISTRICT 7B
Allday N15 #5
Howard County · Signal Peak (Wolfcamp) field · Vertical
Allday N15 #5 (API 42-227-35916) is a plugged well in Howard County, plugged May 6, 2015, last operated by Highpeak Energy Holdings LLC.
The RRC has issued one drilling permit (amended once), issued November 30, 2004, permitted to 7,950 ft.
It was permitted by Whiting Oil And Gas Corporation and has since transferred to Highpeak Energy Holdings LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Rustler, Queen, Grayburg, San Andres.
Its lease has reported 62.5K barrels of oil and 507K mcf of gas since March 2001, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Whiting Oil and Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 4, 2024
- Permits on file
- 896
- Phone
- (817) 850-9200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Highpeak Energy Holdings LLC |
| Production reports | Highpeak Energy Holdings, LLCthrough Apr 2026 |
| Latest permit | Whiting Oil and Gas CorporationNov 30, 2004 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,950
- total depth, ft
- 2
- permits on file
- Nov 30, 2004
- last permit issued
- Nov 4, 2005
- completed
- 62.5K
- cumulative oil, bbl
- 507K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 4, 2005
- Shut in
- —
- Plugged
- May 6, 2015
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Allday N15 O-10-36631 | Signal Peak (Wolfcamp) | Highpeak Energy Holdings, LLC | 3 | 62.5K | 507K | Mar 2001 – Jul 2026 |
Gas, mcf lease total
Last 12 months 2,060 · prior 12 2,689(-23%)
Oil, barrels lease total
Last 12 months 284 · prior 12 400(-29%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Devon SFS Operating, Inc.Mar 2001 → Oct 2002
- 2Devon Energy Production Co, L.P.Nov 2002 → Nov 2002
- 3L.C.S. Production CompanyDec 2002 → Sep 2003
- 4Crownquest Operating, LLCOct 2003 → Sep 2004
- 5Whiting Oil and Gas CorporationOct 2004 → Dec 2022
- 6Highpeak Energy Holdings, LLCJan 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 554200-98 | Drill | Whiting Oil and Gas Corporation | Mar 1, 2005 | Nov 30, 2004 | Aug 9, 2005 | 7,950 |
| 554200-99 | Drill | Whiting Oil and Gas Corporation | Nov 30, 2004 | Nov 30, 2004 | Aug 9, 2005 | 7,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 4, 2005 | Allday N15 O-10-36631 | Signal Peak (Wolfcamp) | Highpeak Energy Holdings LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,385 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 1,002 | 1,383 |
| Queen | 1,919 | 466 |
| Grayburg | 2,136 | 249 |
| San Andres | 3,123 | -738 |
| WolfcampBASE WOLFCAMP LIMESTONE | 7,499 | -5,114 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,730 | 7,770 | Perforated |
| 7,774 | 7,909 | Perforated |
| 7,894 | 7,918 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,153 | 11 | 1,350 S |
| 5.5 | 8,089 | 7.875 | 605 S |
| 5.5 | — | 7.875 | 660 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 17, 2010 | Nov 10, 2009 | Yes |
| 00 | Mar 12, 2010 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-35916 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-35916 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22735916, documented in the API reference.