TEXAS · WELLS · HOWARD COUNTY · DEVANEY "6" LEASE · API 42-227-35987 · DISTRICT 7B
Devaney 6 #604
Howard County · Signal Peak (Wolfcamp) field · Producing · Vertical
Devaney 6 #604 (API 42-227-35987) is a well in Howard County operated by Highpeak Energy Holdings LLC, completed March 30, 2006 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 16, 2005, permitted to 7,880 ft.
It was permitted by Whiting Oil And Gas Corporation and has since transferred to Highpeak Energy Holdings LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Glorieta, Clear Fork, Wichita-Albany, Wolfcamp.
Its lease has reported 25.5K barrels of oil and 376K mcf of gas since February 2000, last reporting volume in April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Whiting Oil and Gas Corporation; the EWA schedule now lists a different operator.
- Based in
- Fort Worth, TX
- P-5 status
- Active (A)
- P-5 last filed
- Dec 4, 2024
- Permits on file
- 896
- Phone
- (817) 850-9200
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Highpeak Energy Holdings LLC |
| Production reports | Highpeak Energy Holdings, LLCthrough Apr 2026 |
| Latest permit | Whiting Oil and Gas CorporationDec 16, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,880
- total depth, ft
- 1
- permits on file
- Dec 16, 2005
- last permit issued
- Mar 30, 2006
- completed
- 25.5K
- cumulative oil, bbl
- 376K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2000 THROUGH Apr 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 30, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Devaney "6" O-10-36230 | Signal Peak (Wolfcamp) | Highpeak Energy Holdings, LLC | 2 | 25.5K | 376K | Feb 2000 – Apr 2026 |
Gas, mcf lease total
Last 12 months 1,473 · prior 12 2,973(-50%)
Oil, barrels lease total
Last 12 months 80 · prior 12 47(+70%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Santa FE Snyder CorporationFeb 2000 → Oct 2000
- 2Devon SFS Operating, Inc.Nov 2000 → Oct 2002
- 3Devon Energy Production Co, L.P.Nov 2002 → Nov 2002
- 4L.C.S. Production CompanyDec 2002 → Sep 2003
- 5Crownquest Operating, LLCOct 2003 → Sep 2004
- 6Whiting Oil and Gas CorporationOct 2004 → Dec 2022
- 7Highpeak Energy Holdings, LLCJan 2023 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 611187-99 | Drill | Whiting Oil and Gas Corporation | Dec 16, 2005 | Dec 16, 2005 | Jan 5, 2006 | 7,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 30, 2006 | Devaney 6 O-10-36230 | Signal Peak (Wolfcamp) | Highpeak Energy Holdings LLC | Producing | 7,880 |
Formation tops
As filed on W-2/G-1. Subsea from 2,360 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Glorieta | 2,727 | -367 |
| Clear ForkCLEARFORK | 3,012 | -652 |
| Wichita-Albany | 4,590 | -2,230 |
| Wolfcamp | 5,607 | -3,247 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,466 | 7,636 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,964 | 11 | 655 S |
| 5.5 | 7,880 | 7.875 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 7, 2008 | Aug 24, 2007 | Yes |
| 00 | Dec 14, 2007 | — | — |
Well logs
2 logs loaded from the RRC's log index, the latest received Jun 13, 2008. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| ResistivityARRAY INDUCTION LOGSpans Glorieta, Clear Fork, Wichita-Albany, Wolfcamp | TIFF | 1,959 to 7,880 | Jun 13, 2008run Apr 20, 2006 | — |
| Neutron/Density PorosityCOMPENSATED NEUTRON THREE DETECTOR LITHO DENSITYSpans Glorieta, Clear Fork, Wichita-Albany, Wolfcamp | TIFF | 200 to 7,880 | Jun 13, 2008run Jan 20, 2006 | — |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-227-35987 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-227-35987 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/22735987, documented in the API reference.