TEXAS · WELLS · HOWARD COUNTY · NIX 9 LEASE · API 42-227-38143 · DISTRICT 7B

Nix 9 #1

Shut in

Howard County · Spraberry (Trend Area) field · Shut In  · Vertical

Nix 9 #1 (API 42-227-38143) is a well in Howard County operated by Ovintiv USA Inc., completed February 6, 2015 and listed as shut in on the RRC schedule, shut in February 1, 2024.

The RRC has issued one drilling permit, issued August 18, 2014, permitted to 9,905 ft.

It was permitted by Athlon Holdings LP and has since transferred to Ovintiv USA Inc. on the wellbore schedule.

Completion filings report 10 formation tops, including Yates, San Andres, Clear Fork, Spraberry.

Its lease has reported 18.7K barrels of oil and 45.4K mcf of gas since February 2015, last reporting in July 2026.

Operator of record

Ovintiv USA Inc.

Permitted by Athlon Holdings LP; the EWA schedule now lists a different operator.

Based in
Denver, CO
P-5 status
Active (A)
P-5 last filed
Dec 12, 2025
Permits on file
1,390
Phone
(720) 876-5176

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOvintiv USA Inc.
Production reportsOvintiv USA Inc.through Jul 2023
Latest permitAthlon Holdings LPAug 18, 2014

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,905
total depth, ft
1
permits on file
Aug 18, 2014
last permit issued
Feb 6, 2015
completed
18.7K
cumulative oil, bbl
45.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 6, 2015
Shut in
Feb 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nix 9 O-10-46170Spraberry (Trend Area)Ovintiv USA Inc.118.7K45.4KFeb 2015 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

050100150202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Encana Oil & Gas(usa) Inc.Feb 2015 → Jan 2020
  2. 2Ovintiv USA Inc.Feb 2020 → Jul 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
791220-99DrillAthlon Holdings LPJul 8, 2014Aug 18, 2014Nov 30, 20149,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 6, 2015Nix 9 O-10-46170Spraberry (Trend Area)Ovintiv USA Inc.Shut In · shut in Feb 1, 20249,905

Formation tops

As filed on W-2/G-1. Subsea from 2,623 ft elevation.Download CSV →

FormationMD ftSubsea
Yates1,634989
San AndresSAN ANDRES - HIGH FLOWS, H2S, CO2,780-157
Clear ForkCLEARFORK - SEVERE WATER FLOWS3,795-1,172
Spraberry5,883-3,260
Leonard7,048-4,425
Dean7,111-4,488
Wolfcamp7,236-4,613
Coleman Junction——
Glorieta——
Seven Rivers——

Perforations

Perforated and open-hole intervals.

FromToType
7,1109,452Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37532017.5350 S
8.6253,96511490 S
5.59,9057.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 29, 2015May 14, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/22738143, documented in the API reference.