TEXAS · WELLS · IRION COUNTY · SUGG "67" LEASE · API 42-235-33923 · DISTRICT 6E
Sugg 67 #2
Irion County · Sugg Ranch (Canyon) field · Vertical
Sugg 67 #2 (API 42-235-33923) is a plugged well in Irion County, plugged March 12, 2014, last operated by Compass Energy Operating LLC.
The RRC has issued one drilling permit, issued July 18, 2005, permitted to 7,800 ft.
It was permitted by Txp, Incorporated and has since transferred to Compass Energy Operating LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Clear Fork, Dean, Spraberry, Wolfcamp.
Operator of record
Permitted by TXP, Incorporated; the EWA schedule now lists a different operator.
- Based in
- Tulsa, OK
- P-5 status
- Active (A)
- P-5 last filed
- Jan 7, 2026
- Permits on file
- 27
- Phone
- (918) 376-0550
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Compass Energy Operating LLC |
| Production reports | Exco Resources, Inc.through Nov 2010 |
| Latest permit | TXP, IncorporatedJul 18, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,800
- total depth, ft
- 1
- permits on file
- Jul 18, 2005
- last permit issued
- Sep 1, 2005
- completed
- 0
- cumulative oil, bbl
- 87.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Mar 2014
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 1, 2005
- Shut in
- —
- Plugged
- Mar 12, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sugg "67" G-9-212270 | Sugg Ranch (Canyon) | Exco/Hgi JV Assets, LLC | 1 | 0 | 87.4K | Sep 2005 – Mar 2014 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1TXP, IncorporatedSep 2005 → Oct 2007
- 2Exco Resources, Inc.Nov 2007 → Nov 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603516-99 | Drill | TXP, Incorporated | Jul 15, 2005 | Jul 18, 2005 | Jul 27, 2005 | 7,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 1, 2005 | Sugg 67 G-9-212270 | Sugg Ranch (Canyon) | Compass Energy Operating LLC | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,553 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clear ForkCLEARFORK | 3,262 | -709 |
| Dean | 4,215 | -1,662 |
| SpraberrySPRAYBERRY | 5,256 | -2,703 |
| Wolfcamp | 5,923 | -3,370 |
| Canyon | 7,079 | -4,526 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,188 | 7,230 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,045 | 11 | 450 S |
| 4.5 | 7,449 | 7.875 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 25, 2006 | Sep 22, 2005 | Yes |
| 00 | Nov 21, 2005 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-235-33923 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-235-33923 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23533923, documented in the API reference.