TEXAS · WELLS · JACK COUNTY · API 42-237-39966 · DISTRICT 7C
Cherryhomes #B 1
Jack County · Newark East (Barnett Shale) field · SWR-10-Well · Vertical
Cherryhomes #B 1 (API 42-237-39966) is a well in Jack County operated by Eagleridge Operating LLC, completed April 29, 2014 and listed as swr-10-well on the RRC schedule, shut in November 1, 2024.
The RRC has issued one drilling permit, issued February 7, 2014, permitted to 5,820 ft.
It was permitted by Brigadier Operating, LLC and has since transferred to Eagleridge Operating LLC on the wellbore schedule.
Completion filings report 10 formation tops, including Canyon, Palo Pinto, Village Bend, Weir.
Its 2 leases have reported 15.6K barrels of oil and 94.9K mcf of gas since April 2014, last reporting volume in October 2024. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Brigadier Operating, LLC; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 129
- Phone
- (214) 295-6704
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagleridge Operating LLC |
| Production reports | Eagleridge Operating, LLCthrough Oct 2024 |
| Latest permit | Brigadier Operating, LLCFeb 7, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,820
- total depth, ft
- 1
- permits on file
- Feb 7, 2014
- last permit issued
- Apr 29, 2014
- completed
- 15.6K
- cumulative oil, bbl
- 94.9K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2014 THROUGH Oct 2024
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 29, 2014
- Shut in
- Nov 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cherryhomes G-13-274600 | KRS (Marble Falls) | Eagleridge Operating, LLC | 1 | 15.6K | 94.9K | Apr 2014 – Oct 2024 |
| Cherryhomes G-13-274654 | Newark, East (Barnett Shale) | Eagleridge Operating, LLC | 1 | 0 | 0 | Apr 2014 – — |
Gas, mcf lease total
Last 12 months 0 · prior 12 10(-100%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brigadier Operating, LLCApr 2014 → Jul 2017
- 2Petrobal Omega 1, LLCSep 2017 → Jul 2021
- 3Eagleridge Operating, LLCAug 2021 → Oct 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 777771-99 | Drill | Brigadier Operating, LLC | Jan 21, 2014 | Feb 7, 2014 | Mar 24, 2014 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Apr 29, 2014 | Cherryhomes G-13-274654 | Newark East (Barnett Shale) | Eagleridge Operating LLC | SWR-10-Well · shut in Apr 1, 2014 | 5,820 |
| Apr 29, 2014 | Cherryhomes G-13-274600 | KRS (Marble Falls) | Eagleridge Operating LLC | Temp Abandoned · shut in Nov 1, 2024 | 5,820 |
Formation tops
As filed on W-2/G-1. Subsea from 946 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| CanyonCANYON SAND | 90 | 856 |
| Palo Pinto | 1,215 | -269 |
| Village Bend | 1,949 | -1,003 |
| Weir | 2,162 | -1,216 |
| Butram | 2,375 | -1,429 |
| AtokaATOKA CONGLOMERATE | — | — |
| BendBEND CONGLOMERATE | — | — |
| Ellenburger | — | — |
| Gunsight | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,310 | 5,456 | Perforated |
| 5,482 | 5,580 | Perforated |
| 5,640 | 5,700 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 11.75 | 347 | 14.75 | 225 S |
| 8.625 | 2,344 | 11 | 575 S |
| 5.5 | 5,816 | 7.875 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 19, 2014 | Sep 27, 2014 | — |
| 00 | Nov 14, 2014 | Sep 27, 2014 | Yes |
Well logs
2 logs loaded from the RRC's log index, the latest received Apr 14, 2017. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| NEUTRON/DENSITY POROSITYSpans Weir, Butram | TIFF | 2,365 to 5,813 | Apr 14, 2017run Apr 3, 2014 | 4.42 |
| RESISTIVITYSpans Weir, Butram | TIFF | 2,365 to 5,813 | Apr 14, 2017run Apr 3, 2014 | 3.21 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-39966 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-39966 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23739966, documented in the API reference.