TEXAS · WELLS · JACK COUNTY · API 42-237-40071 · DISTRICT 7C
Halsell Ranch #B 11
Jack County · Newark East (Barnett Shale) field · SWR-10-Well · Vertical
Halsell Ranch #B 11 (API 42-237-40071) is a well in Jack County operated by Eagleridge Operating LLC, completed July 29, 2014 and listed as swr-10-well on the RRC schedule, shut in February 1, 2024.
The RRC has issued one drilling permit, issued May 3, 2014, permitted to 5,315 ft.
It was permitted by Brigadier Operating, LLC and has since transferred to Eagleridge Operating LLC on the wellbore schedule.
Completion filings report 13 formation tops, including Palo Pinto, Village Bend, Weir, Butram.
Its 2 leases have reported 15.6K barrels of oil and 1.32M mcf of gas since July 2014, last reporting volume in January 2024. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Brigadier Operating, LLC; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active – Extension (X)
- P-5 last filed
- Apr 8, 2026
- Permits on file
- 129
- Phone
- (214) 295-6704
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Eagleridge Operating LLC |
| Production reports | Eagleridge Operating, LLCthrough Jan 2024 |
| Latest permit | Brigadier Operating, LLCMay 3, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,315
- total depth, ft
- 1
- permits on file
- May 3, 2014
- last permit issued
- Jul 29, 2014
- completed
- 15.6K
- cumulative oil, bbl
- 1.32M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2014 THROUGH Jan 2024
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jul 29, 2014
- Shut in
- Feb 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Halsell Ranch G-13-273997 | KRS (Marble Falls) | Eagleridge Operating, LLC | 1 | 15.6K | 1.32M | Jul 2014 – Jan 2024 |
| Halsell Ranch G-13-274113 | Newark, East (Barnett Shale) | Eagleridge Operating, LLC | 1 | 0 | 0 | Jul 2014 – — |
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Brigadier Operating, LLCJul 2014 → Aug 2017
- 2Petrobal Omega 1, LLCSep 2017 → Jun 2021
- 3Eagleridge Operating, LLCSep 2021 → Jan 2024
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 783346-99 | Drill | Brigadier Operating, LLC | Mar 27, 2014 | May 3, 2014 | May 20, 2014 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jul 29, 2014 | Halsell Ranch G-13-274113 | Newark East (Barnett Shale) | Eagleridge Operating LLC | SWR-10-Well · shut in Sep 1, 2014 | 5,315 |
| Jul 29, 2014 | Halsell Ranch G-13-273997 | KRS (Marble Falls) | Eagleridge Operating LLC | Temp Abandoned · shut in Feb 1, 2024 | 5,315 |
Formation tops
As filed on W-2/G-1. Subsea from 1,196 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Palo Pinto | 700 | 496 |
| Village Bend | 1,355 | -159 |
| Weir | 1,500 | -304 |
| Butram | 1,694 | -498 |
| Bryson | 2,395 | -1,199 |
| Caddo | 4,111 | -2,915 |
| Conglomerate | 4,239 | -3,043 |
| Marble Falls | 4,534 | -3,338 |
| AtokaATOKA CONGLOMERATE | — | — |
| BendBEND CONGLOMERATE | — | — |
| CanyonCANYON SAND | — | — |
| Gunsight | — | — |
| Strawn | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,558 | 4,616 | Perforated |
| 4,642 | 4,736 | Perforated |
| 4,952 | 5,000 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 295 | 12.25 | 200 S |
| 5.5 | 5,315 | 7.875 | 215 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 20, 2014 | Oct 10, 2014 | — |
| 00 | Oct 14, 2014 | Oct 10, 2014 | Yes |
Well logs
2 logs loaded from the RRC's log index, the latest received Jun 12, 2017. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| NEUTRON/DENSITY POROSITYSpans Palo Pinto, Village Bend, Weir, Butram, Bryson, Caddo, Conglomerate, Marble Falls | TIFF | 289 to 5,260 | Jun 12, 2017run May 23, 2014 | 4.00 |
| RESISTIVITYSpans Palo Pinto, Village Bend, Weir, Butram, Bryson, Caddo, Conglomerate, Marble Falls | TIFF | 289 to 5,260 | Jun 12, 2017run May 23, 2014 | 3.87 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-237-40071 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-237-40071 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/23740071, documented in the API reference.