TEXAS · WELLS · JONES COUNTY · JOYCE LEASE · API 42-253-35178 · DISTRICT 6E

Joyce #1

Y

Jones County · Noodle (Palo Pinto) field · Producing  · Vertical

Joyce #1 (API 42-253-35178) is a well in Jones County operated by Sojourner Drilling Corporation, completed February 24, 2011 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2008 and 2010, permitted to 5,537 ft.

Completion filings report 3 formation tops, including Swastika, Canyon, Palo Pinto.

Its lease has reported 53.1K barrels of oil and 184K mcf of gas since February 2011, last reporting volume in April 2026.

Operator of record

Sojourner Drilling Corporation

Based in
Abilene, TX
P-5 status
Active (A)
P-5 last filed
Oct 7, 2025
Permits on file
872
Phone
(325) 672-2832

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSojourner Drilling Corporation
Production reportsSojourner Drilling Corporationthrough Apr 2026
Latest permitSojourner Drilling CorporationDec 15, 2010
5,537
total depth, ft
2
permits on file
Dec 15, 2010
last permit issued
Feb 24, 2011
completed
53.1K
cumulative oil, bbl
184K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 24, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Joyce O-8-30771Noodle (Palo Pinto)Sojourner Drilling Corporation153.1K184KFeb 2011 – Apr 2026

Oil, barrels lease total

Last 12 months 1,666 · prior 12 1,416(+18%)

0100200300202420252026

Gas, mcf lease total

Last 12 months 75 · prior 12 0

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Sojourner Drilling CorporationApr 2011 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
706847-99DrillSojourner Drilling CorporationDec 9, 2010Dec 15, 2010Jan 14, 20115,900
676079-99DrillSojourner Drilling CorporationDec 9, 2008Dec 12, 2008—5,900

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 24, 2011Joyce O-8-30771Noodle (Palo Pinto)Sojourner Drilling CorporationProducing5,537

Formation tops

As filed on W-2/G-1. Subsea from 1,921 ft elevation.Download CSV →

FormationMD ftSubsea
Swastika3,194-1,273
CanyonCANYON SAND4,124-2,203
Palo Pinto4,624-2,703

Perforations

Perforated and open-hole intervals.

FromToType
4,6244,628Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62512612.2590 S
5.54,8467.875520 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Oct 5, 2011Jun 14, 2011Yes

Well logs

1 log loaded from the RRC's log index, the latest received Jan 16, 2014. Density, Neutron, Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.

Open the RRC's log search for this well ↗
Logas describedFiles Intervalft, as filedDatereceivedSizeMB
COMBINATION: RESISTIVITY/NEUTRON/DENSITY POROSITYSpans Canyon, Palo PintoTIFF4,507 to 5,545Jan 16, 2014run Jan 27, 20111.79

"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.

Find logs withinmiles of this well:List →Map →

Search the well logs loaded into Petrora →

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

The logs loaded for this well are under Well logs, with the RRC's log search for it.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/25335178, documented in the API reference.