TEXAS · WELLS · KENT COUNTY · SALT CREEK FIELD UNIT LEASE · API 42-263-30785 · DISTRICT 7B

Salt Creek Field Unit #F-211

Y

Kent County · Salt Creek field · Injection  · Vertical

Salt Creek Field Unit #F-211 (API 42-263-30785) is a well in Kent County operated by Oxy USA Wtp LP, completed July 2, 2025 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 10, 1981, permitted to 6,650 ft.

It was permitted by Mobil Producing TX. & N.M. Inc. and has since transferred to Oxy USA Wtp LP on the wellbore schedule.

Completion filings report 6 formation tops, including Clear Fork, Vale Shale, Yale Shale, Yate Shale.

Its lease has reported 140M barrels of oil and 284M mcf of gas since January 1993, last reporting volume in April 2026. The lease carries 538 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 662K barrels injected in the 12 months reported through May 2026.

Operator of record

OXY USA WTP LP

Permitted by Mobil Producing TX. & N.M. Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 16, 2025
Permits on file
2,289
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleOXY USA WTP LP
Production reportsOXY USA WTP LPthrough Apr 2026
Latest permitMobil Producing TX. & N.M. Inc.Jun 10, 1981

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,650
total depth, ft
1
permits on file
Jun 10, 1981
last permit issued
Jul 2, 2025
completed
140M
cumulative oil, bbl
284M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 2, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 538 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Salt Creek Field Unit O-11-5254Salt CreekOXY USA WTP LP538140M284MJan 1993 – Apr 2026

Oil, barrels lease total

Last 12 months 1,472,050 · prior 12 1,745,538(-16%)

0100K200K202420252026

Gas, mcf lease total

Last 12 months 3,945,103 · prior 12 5,060,124(-22%)

0200K400K600K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Jul 2005
  2. 2OXY USA WTP LPAug 2005 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
124598-99DrillMobil Producing TX. & N.M. Inc.Jun 10, 1981Jun 10, 1981Jul 4, 19816,750

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 2, 2025Salt Creek Field Unit O-11-5254Salt CreekOXY USA WTP LPInjection6,650
Mar 6, 1987Salt Creek Field Unit O-11-5254Salt CreekOXY USA WTP LPNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,130 ft elevation.Download CSV →

FormationMD ftSubsea
Clear ForkCLEARFORK2,200-70
Vale Shale2,960-830
Yale Shale2,960-830
Yate Shale2,960-830
Coleman Junction4,090-1,960
CanyonCANYON REEF6,322-4,192
CanyonCANYON REEF6,322-4,192

Perforations

Perforated and open-hole intervals.

FromToType
6,3546,395Perforated
6,3546,504Perforated
6,3546,614Perforated
6,3786,504Perforated
6,4046,504Perforated
6,4806,615Perforated
6,5406,615Perforated
6,6156,650Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,51112.251,300 S
9.6251,51112.751,300 S
9.6251,511——
2.8756,283——
76,6108.75650 S
76,610——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Nov 7, 2025Oct 23, 2025—
00Jan 28, 2020Oct 31, 2019—
00Dec 29, 2004Feb 4, 2002—
00Jul 26, 1996Feb 22, 1996—
00Mar 6, 1989Feb 16, 1989—
00Mar 1, 1989Apr 3, 1987—
00Apr 20, 1987Apr 3, 1987—
00Dec 7, 1984Nov 5, 1984—
00Apr 16, 1984Jan 20, 1984—
00Jan 12, 1984Jan 20, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

662K
bbl, last 12 reported months
24.9M
bbl, all reported
May 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000053694H-1 InjectionActive12,0003,0006,150–6,800

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 661,739 · prior 12 291,536(+127%)

050K100K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/26330785, documented in the API reference.