WELL · 42-263-31297 · DISTRICT 8
Daugherty SWD #1
Kent County · Vertical
Daugherty Swd #1 (API 42-263-31297) is a plugged well in Kent County, plugged February 3, 1988, last operated by Sharp Image Energy, Inc..
The RRC has issued 2 drilling permits (amended once) between 1987 and 2011, permitted to 8,000 ft.
Completion filings report 3 formation tops, including Glorieta, Canyon, Ellenburger.
It holds an active disposal or injection permit, with 20.7K barrels injected in the 12 months reported through May 2026.
Operator of record
Big Spring, TX · P-5 Y, filed May 4, 2026 · 665 permits on file · (432) 238-6478
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Sharp Image Energy, Inc.Sep 23, 2011 |
- 8,000
- total depth, ft
- 3
- permits on file
- Sep 23, 2011
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Feb 3, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Daugherty SWD O-11-69801 | Sie Morrison (Upper Canyon) | Sharp Image Energy, Inc. | 1 | 0 | 0 | Aug 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 724694-98 | Reenter | Sharp Image Energy, Inc. | Jan 31, 2012 | Sep 23, 2011 | Aug 23, 2011 | 7,700 |
| 724694-99 | Reenter | Sharp Image Energy, Inc. | Sep 21, 2011 | Sep 23, 2011 | — | 7,700 |
| 340066-99 | Drill | Hughes Texas Petroleum | Dec 11, 1987 | Dec 11, 1987 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-11-69801 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,124 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| GlorietaGLORIETTA | 2,096 | 28 |
| Canyon | 6,600 | -4,476 |
| EllenburgerELLENBERGER | 7,657 | -5,533 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,086 | 4,140 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 275 | 17.5 | 265 S |
| 8.625 | 1,516 | 11 | 750 S |
| 5.5 | 7,681 | 7.875 | 350 S |
| 5.2 | 7,681 | 7.875 | 350 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 5, 2012 | Feb 23, 2012 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-263-31297 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-263-31297 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 20.7K
- bbl, last 12 reported months
- 673K
- bbl, all reported
- May 2026
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000103529 | W-14 Disposal | Active | 1,500 | 2,015 | 4,036–4,140 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 20,693 · prior 12 21,451(-4%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/26331297, documented in the API reference.